Skip to content
Aperlena

EX-RD12 Epinal - Deconstruction of a Reinforced Earth(R) wall on rue Louis Bleriot

Original EX-RD12 Epinal - Déconstruction d’un mur en Terre Armée® rue Louis Blériot-.

Open Contract notice 17 days left
Watch this tender

Deadline 8 Oct. If it moves, an email when the register sees it. A correction: the same email. Your plan: decide by 24 Sep, questions by 24 Sep, draft by 1 Oct. Log in

  1. Published
  2. Today
  3. Deadline open for 78 days
  4. Awarded pending

Summary

Machine-generated summary

This tender covers the deconstruction of a Reinforced Earth(R) wall on rue Louis Bleriot in Epinal, and the reconstruction of a retaining structure backed against a wall and held by flexible ties, to restore a pedestrian and cycling path. Firm tranche: demolition of 415 m2 of Reinforced Earth wall, 3400 m3 of earthworks, 1000 ml of soil nails, localised expert inspections, minor concrete repairs, and a 500 m2 supporting wall. Optional tranche 1: 90 m2 of shotcrete; tranche 2: 600 ml of additional nailing; tranche 3: 100 m3 cavity filling. The buyer, estimated value, deadline and bid procedure are not specified in the information provided.

Description

La présente consultation concerne la EX-RD12 Epinal - Déconstruction d’un mur en Terre Armée® rue Louis Blériot et reconstruction d’un ouvrage de soutènement adossé à une paroi et maintenu à l’aide de liens souples pour rétablir un cheminement piétonnier et cyclable. Les principales quantités sont : Tranche Ferme : - Démolition de mur en écaille type Terre Armée® : 415 m2 - Terrassement : 3400 m3 - Réalisation de clous : 1000 ml de clous - Expertises localisées de la paroi clouée : - Petites réparations de béton sur la paroi clouée existante : injection de fissure, ragréage - Mur de soutènement adossé à une paroi et maintenu l’aide de liens souples : 500 m2 Tranche Optionnelle n°1 : - Purge et reconstitution de béton projeté : 90 m² Tranche Optionnelle n°2 : - Clouage complémentaire de la paroi existante : 600 ml de clous Tranche Optionnelle n°3 : - Comblement de cavités en pied de mur : 100 m3-.

Official source

Source: BOAMP - Bulletin officiel des annonces de marchés publics (DILA)

Always verify details on the official notice.

Last verified against BOAMP - Bulletin officiel des annonces de marchés publics (DILA) 1 month ago

Documents on BOAMP - Bulletin officiel des annonces de marchés publics (DILA) (French) bids submitted through Buyer profile (profil d'acheteur) linked on each notice

More from this buyer

Full buyer profile

6 open tenders right now

Recent awards

Similar tenders

Market context

Buyer track record on Aperlena
138 notices tracked · 102 awarded
€21,690,548 in awarded contracts

Never miss a tender like this

8,237 new notices in all sectors in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close