Skip to content
Aperlena

Germany - Carpentry and joinery work - Joinery work (doors, windows)

Original Deutschland - Bautischlerarbeiten - Schreinerarbeiten (Türen, Fenster)

Open Contract notice 33 days left
Watch this tender

Deadline 28 Oct. If it moves, an email when the register sees it. A correction: the same email. Your plan: decide by 14 Oct, questions by 14 Oct, draft by 21 Oct. Log in

  1. Published
  2. Today
  3. Deadline open for 33 days
  4. Awarded pending

Summary

Machine-generated summary

The procurement covers joinery work (doors) as part of the extension of a primary school with all-day care, designated as contract unit number 321. The scope includes 30 doors with two-part steel frames, 5 fire protection doors type T30 with two-part steel frames, 15 overhead door closers, and door leaves with an HPL surface. The works serve to prepare the building for midday supervision of primary school children. The contractor is expected to begin the work planning and coordination with the architect within 12 working days of the request, and the works up to completion ready for acceptance are to take 290 working days from the date named in form 214.H.

Description

Bezeichnung Baumaßnahme: Erweiterung Grundschule mit off. GanztagTitel Leistung: Schreinerarbeiten (Türen) (Vergabe-Einheit Nr. 321)Bekanntmachungs-Angaben zu Art und Umfang der Leistung:-30 Stck. Türen mit 2-teiligen Stahlzargen -5 Stck. T30-Brandschutztüren mit 2-teiligen Stahlzargen -15 Stck. Obertürschließer -Oberfläche Türblatt HPLBei Angabe der geschätzten Laufzeit des Auftrags ("Planed Duration") der EU-Bekanntmachung handelt es sich um: -Aufforderung seitens des Auftraggebers gemäß VOB/B §5 Absatz 2, innerhalb von 12 Werktagen mit der Ausführung der W+M-Planung sowie Abstimmung mit dem Architekten zu beginnen, welche dem Auftragnehmer voraussichtlich bis 20.01.2027 zugeht (siehe in Formblatt 214.H genannte Frist); -die Dauer der Leistung bis zur anbnahmereifen Fertigstellung beträgt 290 Werktage ab der in Formblatt 214.H genannten Frist;-in Formblatt 214.H und Beiblatt befinden sich weitere verbindliche Fristen (unter anderem zu Aufmaßnahme, Montage-Beginn auf Baustelle, etc.) sowie in den weiteren AusschreibungsunterlagenZweck der baulichen Anlage (unter anderem): Mittagsbetreuung von Kindern im GrundschulalterZweck des Auftrags (u.a.) Herstellung des Gebäudes für die Mittagsbetreuung von Kindern im Grundschulalter

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 4 hours ago

More from this buyer

Full buyer profile

2 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Germany

Company Wins Total awarded Last win
Lindner SE 52 €38.8M Sep 2026
Fliesen Röhlich GmbH 51 €10.7M Sep 2026
LEONHARD WEISS GmbH & Co. KG 49 €91.1M Sep 2026
STRABAG AG 46 €118.9M Sep 2026
Ed. Züblin AG 45 €183.0M Sep 2026

Based on 16423 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,561,665
25,737 open across Europe right now
Buyer track record on Aperlena
14 notices tracked · 1 awarded
€159,639 in awarded contracts

Never miss a tender like this

1,771 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close