Skip to content
Aperlena

Germany - Construction works - Extension of Gymnasium Alfter / total contractor contract

Original Deutschland - Bauarbeiten - Erweiterung Gymnasium Alfter / Totalunternehmervertrag

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

The municipality of Alfter intends to build an extension for the Gymnasium (secondary school) at the existing school campus in Alfter-Oedekoven. The new building is to be constructed mainly in three-dimensional timber or timber-hybrid modular construction, connected functionally to the renovated existing building and the adjacent sports hall. Total educational usable floor area is about 7,400 m2, split between the existing building and the new building. The ground floor (concrete) and the arena (timber, non-modular) are built conventionally. Operation is required by the start of the school year 2029/2030 at the latest, with earlier completion by 2028/2029 rewarded as an award criterion. Interim container solutions may be used.

Description

Die Gemeinde Alfter beabsichtigt den Neubau eines Erweiterungsgebäudes für das Gymnasium am Standort des bestehenden Schulcampus Oedekoven (Am Rathaus 11, 53347 Alfter-Oedekoven). Gegenstand des Projekts ist die Errichtung eines Erweiterungsneubaus grundsätzlich in dreidimensionaler Holz- oder/ Holz-Hybrid-Modulbauweise unter funktionaler und baulicher Einbindung des bereits sanierten Bestandsgebäudes sowie der angrenzenden Sporthalle. Die gesamte pädagogische Nutzfläche beträgt ca. 7.400 m² und wird auf das Bestandsgebäude und den Neubau aufgeteilt. Abweichend von der Modulbauweise sind das Erdgeschoss (Hanglage, Beton/WU-Beton) und die Arena (Holzbauweise, kein Modulbau) in konventioneller Bauweise auszuführen. Der Schulerweiterungsneubau soll spätestens zum Schuljahresbeginn 2029/2030 (bis spätestens 05/2029) in Betrieb genommen werden. Eine frühzeitige Inbetriebnahme zum Schuljahresbeginn 2028/2029 (bis 05/2028) ist anzustreben und wird als Zuschlagskriterium besonders bewertet. Das Schuljahr 2027/2028 und ggf. 2028/2029 kann im Interimsbetrieb (Containerlösung) stattfinden.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

This buyer has no award history in this sector yet. Usual winners, Construction work - Germany

Company Wins Total awarded Last win
Lindner SE 52 €38.8M Sep 2026
Fliesen Röhlich GmbH 51 €10.7M Sep 2026
LEONHARD WEISS GmbH & Co. KG 49 €91.1M Sep 2026
STRABAG AG 46 €118.9M Sep 2026
Ed. Züblin AG 45 €183.0M Sep 2026

Based on 16423 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,848,072
25,750 open across Europe right now
Buyer track record on Aperlena
2 notices tracked · 0 awarded

Never miss a tender like this

1,779 new notices in Construction work in Germany in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close