Skip to content
Aperlena

Denmark - Architectural, engineering and planning services - Supplier Qualification System for EPCM consultant for the Danish hydrogen backbone

Awarded Contract award No deadline published
Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

  1. Published
  2. Awarded pending

Description

The Danish Hydrogen Backbone project (DHB) is a comprehensive effort to establish a hydrogen infrastructure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renewable energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (DHB1), and thereby having this part operational by the end of 2030. The purpose of establishing the SQS is to be able to tender for full-service consultancies (EPCM suppliers), who can support Energinet in building the DHB. The EPCM supplier will function as a strategic partner to Energinet and will be required to deliver on wide area of Engineering, Procurement and Construction-Management activities, while simultaneously engaging in the overall project-management organization in Energinet. The EPCM supplier is expected to be responsible for the areas of: a) design (this includes producing and developing the detailed design); (b) procurement of necessary materials and equipment; (c) management and administration of the construction contracts. DHB1 includes the conversion of 88 km 30” methane pipeline (one out of two parallel pipelines) and the establishment of 45 km 36” hydrogen pipeline including L/V-stations and PLR-stations, along with metering and regulation stations on the mainline as well as branch off connection stations for hydrogen producers and consumers. The decision to initially build only DHB1 reflects a pragmatic approach for developing a scalable hydrogen infrastructure that can be expanded as market demand and production capacity grow. The first call for tender on the SQS will include an EPCM contract for DHB1 and potentially options for additional parts of the full DHB. Further EPCM contracts are expected to be tendered under the SQS, when political decisions for the remaining parts of the DHB are sin place.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 3 weeks ago

Similar tenders

Market context

Avg. open tender · Architecture & engineering services
€9,430,611
15,620 open across Europe right now
Buyer track record on Aperlena
1 notices tracked · 1 awarded

Never miss a tender like this

10 new notices in Architecture & engineering services in Denmark in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close