Summary
Machine-generated summaryThe buyer Ředitelství silnic a dálnic s. p. awarded a contract on 2024-04-15 for the construction of the D3 motorway section 0312/I between Kaplice nádraží and Nažidla. The works cover a newly built four-lane motorway of category D 25.5/130, 11.990 km long, from km 159.550 to 171.550, with an asphalt surface, an SOS system and necessary drainage. The route runs mostly through open, undeveloped agricultural land and forest, west of the existing road I/3. The project includes several bridges, including two viaducts named 'Zdíky' and 'Suchdol', a rest area called 'Suchdol' on both sides, and a noise barrier 'Osovský dvůr' in the cadastral area Střítež u Kaplice. The section connects to the previous construction 0311 Třebonín - Kaplice nádraží.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 weeks ago
More from this buyer
Full buyer profile81 open tenders right now
- Czech Republic - Motorway construction - D55, 5506 Napajedla - Babice 1 day left
- Czech Republic - Road works for motorways - D1 01313 Connection of the Cernovicka terasa rest area to the D1 1 day left
- Czech Republic - Technical studies - D0 519 Suchdol - Březiněves - Supplementary parts of the basic archaeological risk study 6 days left
Recent awards
Similar tenders
1
day left
€380,722,215
est. value
Market context
- Avg. open tender · Construction work
- €31,337,817
- Buyer track record on Aperlena
- 4,697 notices tracked · 3,804 awarded
- €143,866,362,416 in awarded contracts
Never miss a tender like this
325 new notices in Construction work in Czechia in the last 7 days. Get an email when new ones appear. Free.
Set up my alert