Summary
Machine-generated summaryAquafin NV awarded a public works contract for Project 22.485/1 & KTB3022 in Bertem and Kortenberg. The works involved the construction of a sewerage system, extension of the Den Tomme pump station and pressure main, and works in Wijk Den Tomme. The scope included archaeological research, all earthworks, installation of kerbs and gutters, foundations in broken materials and sand-cement, surfacing in concrete, bituminous products, paving stones, grass tiles, cobbles and grass grid tiles, drainage pipes, driveways, green planting, Berliner and sheet pile walls, an overflow structure, gullies, buffer basins, ditches, and reinstatement of pavements and house entrances. DECKX ALGEMENE ONDERNEMINGEN won the contract for EUR 3,240,534.98.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Report an error in this notice
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 2 days ago
What this buyer has paid before
Based on 37 comparable contracts this buyer awarded in this sector over the last 4 years.
- This award
- €3.2M
- Median award
- €6.9M
- Middle half of past awards
- €5.4M to €9.2M
The award is smaller than three in four past awards.
Most recent awards
- Construction of sewer lines - KAS3027 - Kasterlee, redevelopment of the school environment on Pastorijstraat €1,862,092
- Sewage treatment plant construction works - Hydraulic expansion of the Riemst wastewater treatment plant €7,022,856
- Sewage treatment plant works - Hydraulic expansion of the Riemst wastewater treatment plant €6,909,360
- België - Aanleggen van afvalwaterleidingen - Project 22.516/1 - Hasselt, Aanleg gescheiden riolering Gulmerstraat, Leenstraat, ea. (Hasselt) €4,591,603
- België - Bouwwerkzaamheden voor rioolwaterzuiveringsinstallaties - Project 23.610/1 - RWZI Houthalen, renovatie slibgistingsinstallatie €8,107,644
Award values as published by the official sources. Use them as a guide, not a rule: scope, lots and duration differ between contracts.
The buyer
Full buyer profileAquafin NV
- notices in the register
- 318
- awards
- 91
- awarded in total
- €291.5M
Who wins its contracts
Many suppliers- different companies won its awards
- 60
- of the awards went to the three most frequent winners
- 16%
- of its calls state an estimated value
- 5%
Based on 81 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 4.2
- of those lots received a single tender
- 6%
- of the awards went to companies based in another country
- 4%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
One dot per award, on the day it was signed, sized by its value. A ring is an award with no published value.
Awards most often to
107 open tenders right now
Market context
- open now in Construction work
- 29,296
- median open notice
- €887,507
Who wins in this market
Many suppliersBelgium · Construction work
- different companies won awards here
- 430
- of the awards went to the three most frequent winners
- 6%
- buyers awarded contracts here
- 269
Based on 577 awards with a named winner over the last 3 years. Counted by award, not by value, because lot and framework amounts are not comparable. Concentrated means the three most frequent winners took 65% or more of the awards; many suppliers, under 35% with at least ten different winners.
Competition
- tenders per lot on average (open and restricted procedures)
- 3.8
- of those lots received a single tender
- 12%
- of the awards went to companies based in another country
- 2%
As the official award notices state them, over the last 3 years. Tenders per lot count open and restricted procedures only: in a negotiated procedure or a direct award a single tender is the procedure itself. The country is the one the notice gives for the winner.
Similar tenders
Open now
Awarded before
Never miss a tender like this
1,295 new notices in Construction work in Belgium in the last 7 days. Get an email when new ones appear. Free.
Set up my alert