Summary
Machine-generated summaryThe Insel Gruppe AG - Direktion Immobilien und Betrieb has awarded a contract on the Inselspital site. In the SWAN-Haus building, at the area refrigeration centre (AHV3), the absorption chiller is to be replaced because it has reached the end of its life cycle. The machine will be replaced by a chiller including heat recovery integration. The existing return cooling units will be retained, with measures regarding output levels to be considered, and their operation is to be guaranteed without adjustments to the hydraulics. The cooling distribution of the new chiller will be connected to the existing chilled water, return cooling and heat recovery networks.
Description
Official source
Source: simap.ch - Swiss public procurement platform
Always verify details on the official notice.
Last verified against simap.ch - Swiss public procurement platform 19 hours ago
More from this buyer
Full buyer profile4 open tenders right now
- Framework contract for client support in architecture and client representation 12 days left
- Inselspital: 056 INO, fire alarm system detector replacement, maintenance and service contract 13 days left
- INO MGA; Replacement of ZUKO No deadline published
Recent awards
Similar tenders
Market context
- Avg. open tender · Construction work
- €31,848,072
- Buyer track record on Aperlena
- 7 notices tracked · 3 awarded
- €510,213 in awarded contracts
Never miss a tender like this
369 new notices in Construction work in Switzerland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert