Aller au contenu
Aperlena

Ireland - Consultative engineering and construction services - Direct Award of Contract to Equilibrant Ltd for the carrying out of underwater scour inspections on 43 bridges and prepare reports

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Publié
  2. Attribué en attente

Description

Dublin City Council has invoked Article 32 Clause 3 (c) of Directive 2014/24/EU which states that the negotiated procedure without prior call for competition can be used in so far as is strictly necessary where, for reasons of extreme urgency brought about by events unforeseeable by the contracting authority, the time limits for the open or restricted procedures or competitive procedures with negotiation cannot be complied with. The circumstances invoked to justify extreme urgency shall not in any event be attributable to the contracting authority. A contract has been directly awarded to Equilibrant Ltd, Consulting Engineers, Unit 45, North City Business Centre, 2 Duncairn Gardens, Belfast, BT15 2GG to carry out underwater scour inspections on 43 bridges and prepare reports in accordance with the specification prepared by AtkinsRéalis. On the 29th of January 2026 Dublin City Council received a circular from the TII (ref number 02/2026) advising that inspections of bridges and other road structures should be carried out following severe rainfall events. Scour is the leading cause of bridge failures in the last 100 years. Nearly all of Dublin City Council’s bridges span rivers & canals with the highest risk arising from collapse due to scour of foundations. Dublin City Council has many masonry arch bridges and bridges with piers that are located in the river beds on shallow pad foundations making the bridges vulnerable to scour damage. The main reason why masonry arch bridges collapse is due to scour of foundations as a result of increased water velocity and a high hydraulic head and involves the removal of material from the bed and banks of a channel and from around structure foundations by the action of water, leading to structural damage or failure. Due to climate change water levels are higher during floods and the frequency of flooding has got greater given rise to the risk of more scour to foundations.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois

Plus de cet acheteur

Profil complet de l'acheteur

31 marchés ouverts actuellement

Attributions récentes

Historique des modifications

Chaque republication de cet avis par une source officielle avec un contenu différent. Nous surveillons toutes les sources que nous indexons, y compris les copies régionales du même avis.

  1. A lire avant de repondre
    • Valeur estimée: Fixé à 118 250 €
    • Valeur estimée: Fixé à 118 250 €

Suivez ce marche et nous vous ecrivons dès qu'il change. Créer un compte

Marchés similaires

Contexte de marché

Appel ouvert moyen · Services d'architecture & d'ingénierie
9 413 691 €
14 951 ouverts en Europe actuellement 99% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
695 avis suivis · 574 attribués
328 764 217 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

23 nouveaux avis pour Services d'architecture & d'ingénierie en Irlande au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer