Ireland - Consultative engineering and construction services - Direct Award of Contract to Equilibrant Ltd for the carrying out of underwater scour inspections on 43 bridges and prepare reports

Adjudicada Adjudicación de contrato Sin fecha límite publicada
Vigilar esta licitación

El plazo de ofertas ha cerrado. Una adjudicación o una corrección de este anuncio: un email cuando el registro lo ve. Iniciar sesión

  1. Publicada
  2. Adjudicada pendiente

Descripción

Dublin City Council has invoked Article 32 Clause 3 (c) of Directive 2014/24/EU which states that the negotiated procedure without prior call for competition can be used in so far as is strictly necessary where, for reasons of extreme urgency brought about by events unforeseeable by the contracting authority, the time limits for the open or restricted procedures or competitive procedures with negotiation cannot be complied with. The circumstances invoked to justify extreme urgency shall not in any event be attributable to the contracting authority. A contract has been directly awarded to Equilibrant Ltd, Consulting Engineers, Unit 45, North City Business Centre, 2 Duncairn Gardens, Belfast, BT15 2GG to carry out underwater scour inspections on 43 bridges and prepare reports in accordance with the specification prepared by AtkinsRéalis. On the 29th of January 2026 Dublin City Council received a circular from the TII (ref number 02/2026) advising that inspections of bridges and other road structures should be carried out following severe rainfall events. Scour is the leading cause of bridge failures in the last 100 years. Nearly all of Dublin City Council’s bridges span rivers & canals with the highest risk arising from collapse due to scour of foundations. Dublin City Council has many masonry arch bridges and bridges with piers that are located in the river beds on shallow pad foundations making the bridges vulnerable to scour damage. The main reason why masonry arch bridges collapse is due to scour of foundations as a result of increased water velocity and a high hydraulic head and involves the removal of material from the bed and banks of a channel and from around structure foundations by the action of water, leading to structural damage or failure. Due to climate change water levels are higher during floods and the frequency of flooding has got greater given rise to the risk of more scour to foundations.

Fuente oficial

Fuente: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica siempre los detalles en el anuncio oficial.

Última verificación con TED - Tenders Electronic Daily (Publications Office of the EU) hace 1 mes

Más de este comprador

Perfil completo del comprador

31 licitaciones abiertas ahora mismo

Adjudicaciones recientes

Historial de cambios

Cada vez que una fuente oficial ha vuelto a publicar este anuncio con contenido distinto. Vigilamos todas las fuentes que indexamos, incluidas las copias regionales del mismo anuncio.

  1. Léelo antes de presentarte
    • Valor estimado: Fijado en 118.250 €
    • Valor estimado: Fijado en 118.250 €

Sigue esta licitación y te escribimos en cuanto cambie. Crear cuenta

Licitaciones similares

Contexto de mercado

Licitación abierta media · Servicios de arquitectura e ingeniería
9.439.887 €
14.893 abiertas ahora en Europa 99% por debajo de la media del sector
Historial del comprador en Aperlena
695 anuncios registrados · 574 adjudicados
328.764.217 € en contratos adjudicados

No te pierdas ninguna licitación como esta

23 anuncios nuevos de Servicios de arquitectura e ingeniería en Irlanda en los últimos 7 días. Recibe un email cuando aparezcan anuncios nuevos. Gratis.

Crear mi alerta

Atajos de teclado

Recorre una lista sin tocar el ratón. Los atajos no actúan mientras escribes en un campo.

j
Resultado siguiente
k
Resultado anterior
Intro
Abrir el resultado
n
Página siguiente
p
Página anterior
c
Comparar este resultado
s
Añadir este resultado a la lista corta
/
Ir al cuadro de búsqueda
?
Mostrar estos atajos
Esc
Cerrar