Ingénieur senior international en hydraulique et ressources en eau (irrigation et barrages) - temps partiel (90 jours)
Acheteur: PE Hydrosystem Zletovica
Pays: Macédoine du Nord
Date limite: 27 oct. 2026, 12:00 (UTC+1)
Procédure: Autre procédure
Aperlena: https://aperlena.com/fr/t/international-senior-hydraulic-and-water-resources-engineer-irrigation-systems-and-dams-part-time-90-days-74f84449df
Avis officiel: https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00473297
Si la date limite change ou si l'avis est corrigé, nous vous écrivons.
Se connecter
01
Résumé
Résumé généré automatiquement
Le Ministère de l'agriculture, des forêts et de l'économie hydraulique de Macédoine du Nord recherche, via son unité de mise en œuvre, un ingénieur senior international en hydraulique et ressources en eau pour le projet Zletovica Productivity through Irrigation and Renewable Energy (PIREP), financé par la Banque mondiale. Le consultant assurera le rôle de chef d'équipe technique et un contrôle d'ingénierie indépendant pour la préparation des phases II et III de l'hydrosystème de Zletovica, couvrant le développement de l'irrigation et l'hydroélectricité. Il coordonnera et garantira la qualité des conceptions détaillées prêtes pour la construction, des estimations de coûts, des spécifications techniques et des dossiers d'appels d'offres de génie civil, et appuiera l'évaluation, les permis, la passation et la bancabilité du financement. La mission à temps partiel est de 90 jours, financée par la subvention no TF0D2152, en partenariat avec PS Zletovica.
02
Description
Procédure
Individual Consultant Selection
Financement
World Bank
Référence
PIREP-IC-06
Project: P515976 - Zletovica Productivity through Irrigation and Renewable Energy
Reference: PIREP-IC-06
Procurement method: Individual Consultant Selection
Financing: World Bank
REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES - INDIVIDUAL CONSULTANT - INTERNATIONAL)
Republic of North Macedonia
Ministry of Agriculture, Forestry and Water Economy
Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP)
Grant No.: TF0D2152
Assignment Title: Senior Hydraulic and Water Resources Engineer (International Consultant)
Reference No.: PIREP-IC-06
The Republic of North Macedonia has received financing from the World Bank, acting as trustee of the Grant Facility for Project Preparation (GFPP), for the preparation of the Zletovica Productivity through Irrigation and Renewable Energy Project (PIREP), and intends to apply part of the proceeds for consulting services. The Ministry of Agriculture, Forestry and Water Economy (MAFWE), through its Project Implementation Unit (PIU), is responsible for the implementation of the grant.
The preparation grant supports the updating of technical and hydraulic studies, dam safety documentation, transboundary water analyses, and environmental and social instruments for Phases II and III of the Zletovica Hydrosystem, comprising irrigation development and hydropower generation. The PIU implements the grant in close partnership with PS Zletovica, which leads the technical preparation and prioritization of activities.
The objective of this assignment is to provide overall technical leadership and independent engineering oversight to PS Zletovica, in coordination with the PIU, for preparing Phases II and III. The Consultant will serve as Technical Team Leader, coordinating and assuring the quality of construction-ready detailed designs, cost estimates, technical specifications and civil works bidding documents, and supporting appraisal, permitting, procurement and financing readiness.
The consulting services ("the Services") include coordinating multidisciplinary technical inputs; reviewing studies, investigations, water-resources and hydraulic analyses; advising on investment options and prioritization; reviewing final detailed designs and dam-safety interfaces; integrating environmental and social requirements; providing technical inputs for international-waterways assessments under OP 7.50, economic and financial analyses and jobs contribution reporting; supporting permits and regulatory compliance; reviewing and finalizing technical procurement packages; providing technical procurement support subject to applicable conflict-of-interest requirements; and undertaking capacity building, reporting and missions. The Consultant will report contractually to the PIU Project Director/Coordinator and work in close technical coordination with the Director and designated technical representatives of PS Zletovica, coordinating the inputs of the local Senior Irrigation Engineer and other technical specialists.
The assignment is expected to require up to 90 working days during the GFPP implementation period, ending in December 2027. The allocation of inputs by task and deliverable will be proposed in the inception work plan, with the timing of services coordinated with project-preparation milestones and related activities. The Consultant may work remotely and in North Macedonia, subject to the approved work plan. At least one-third of the total level of effort shall be delivered in North Macedonia. When in North Macedonia, the Consultant will be based primarily at PS Zletovica’s offices, with travel to project sites and relevant institutions as required. Monthly trips to North Macedonia will be required, as agreed with PS Zletovica and the PIU.
The complete Terms of Reference (TOR) for the assignment are included in Annex 1 to this Request for Expressions of Interest and form an integral part of it.
MAFWE now invites eligible individuals ("Consultants") to indicate their interest in providing the Services. Interested Consultants should provide information (curriculum vitae and references in English language only) demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:
• Master’s degree in civil, hydraulic, water resources, irrigation, hydropower, or a closely related engineering field. A relevant professional engineering registration or equivalent certification is desirable.
• At least 15 years of relevant professional experience in hydraulic engineering, water-resources planning, irrigation infrastructure, hydropower, and multipurpose water systems.
• Demonstrated senior-level experience in at least three large or technically complex irrigation or multipurpose water-resources projects involving dams or reservoirs, water-conveyance systems, pressurized or gravity-fed irrigation networks, and/or hydropower facilities.
• Experience as Team Leader, Technical Team Leader, Lead Engineer, or Indep
03
Répondre ou pas ?
Six questions avant d'engager une équipe. Sous chacune, ce que le registre en sait. Les réponses sont les vôtres.
Source officielle
Source : World Bank - Procurement Notices (Bank-financed projects)
Vérifiez toujours les détails dans l'avis officiel.
Macédoine du Nord
PE Hydrosystem Zletovica
Déjà consulté
Ne manquez plus aucun marché comme celui-ci
459 nouveaux avis pour tous les secteurs en Macédoine du Nord au cours des 7 derniers jours.
Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.