GL1 Leisure Centre - Contrat 2 et conception jusqu'au stade RIBA 3

Original GL1 Leisure Centre Contract 2 and Stage 3 Design

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Publié
  2. Attribué en attente

Résumé

Résumé généré automatiquement

Le conseil municipal de Gloucester a attribue le contrat GL1 Leisure Centre Contract 2 and Stage 3 Design a E G Carter & Co Ltd. Le contrat couvre la poursuite de la conception du stade RIBA 3 au stade RIBA 4. L'entreprise dirigera l'equipe de conception et fera appel a des architectes, ingenieurs structures, ingenieurs MEP et autres specialistes pour mener a bien la conception technique. Les prestations comprennent la coordination via des ateliers et reunions, le suivi du processus selon le brief, le perimetre et les couts, le value engineering, la conformite aux Building Regulations et aux approbations du controle de la construction, les conseils sur la constructibilite et les travaux temporaires, ainsi que l'elaboration d'un document de propositions de l'entrepreneur.

Description

See attached contract for details. Progressing Design from RIBA Stage 3 to RIBA Stage 4 1.1. Appoint and lead the Design Team a) Employ Design Consultants: Engage key consultants such as architects, structural engineers, MEP engineers, and other necessary specialists to complete the Technical Design, for manufacturing and construction stage (RIBA 4). b) Design Coordination: Lead design workshops and meetings to ensure integrated design solutions across disciplines. c) Design Management: Manage the design process, ensuring all parties adhere to the design brief, project scope, and cost parameters. d) Review and Sign-off: Regularly review design progress with the Project Manager and ensure all design outputs meet project requirements before sign-off at the end of RIBA Stage 4. 1.2. Technical Design Development a) Technical Design Development: Progress the design to RIBA Stage 4, including detailed specifications, construction details, and schedules for all building elements. b) Value Engineering: Collaborate with the design team and Employer to refine the design, ensuring it aligns with budget constraints while meeting quality and performance standards. c) Building Control: Ensure designs are co-ordinated and with Building Control requirements. Ensure that the design complies with Building Regulations and engage with Building Control as needed to obtain all necessary approvals. 1.3. Design Input a) Providing advice on requirements for off-site design, temporary works and manufactured components. b) Providing advice on all aspects of "buildability" in relation to the proposed design and on the feasibility of construction interfaces and tolerances and suggesting any construction changes which could be used to reduce the incidence of conflicts or difficult interfaces between different elements of a single package of work or between different packages of work. c) Through the design development process, developing a "Contractor's Proposals" document that satisfies the Employer's Requirements for agreement with the Employer to be included in the Main Contract. 2. Supply Chain Engagement and Tendering 2.1 . Pre-tender Engagement with Supply Chain a) Market Engagement: Identify and engage potential subcontractors and suppliers early in the process to gather feedback on design feasibility, material availability, and buildability. b) Package Scoping: Define and scope work packages for the supply chain based on the developed RIBA Stage 4 design. 2.2 . Open Book Tender Process a) Prepare Supply Chain Package Tender Documentation: Compile and issue tender documents, including drawings, specifications and schedules of work. b) Tender Management: Facilitate an open book tender process for supply chain packages, ensuring transparency in pricing and compliance with the project's requirements. c) Bid Evaluation: Evaluate tenders with the Project Manager, Cost Manager, design team and Employer, conducting thorough assessments of cost, quality, and programme implications. d) Negotiations and Recommendations: Lead negotiations with suppliers and subcontractors, providing recommendations for appointment based on best value.

Source officielle

Source : Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Find a Tender Service (UK Cabinet Office / Crown Commercial Service) il y a 1 jour

Documents sur Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (anglais)

Plus de cet acheteur

Profil complet de l'acheteur

Attributions récentes

Marchés similaires

Contexte de marché

Historique de l'acheteur sur Aperlena
4 avis suivis · 2 attribués

Ne manquez plus aucun marché comme celui-ci

6 873 nouveaux avis pour tous les secteurs en Royaume-Uni au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer