Aller au contenu
Aperlena

CAS-01336-R8D9H5 - GARAGE BLOCK Flats 1-12 Gablehurst, Upton, Poole, BH16 5JA - Roofline Renewal

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Publié
  2. Attribué en attente

Description

Project: The refurbishment of the main hipped roof • NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works • Temporarily close off working areas to exclude vehicles and pedestrians from the site using suitable signage and remove them upon the re-opening on completion of the works. • Provide scaffolding/staging as required to the properties to enable safe access to undertake all works outlined within the schedule in accordance with Working at Height Regs. 2005. All scaffolding is to be erected, managed and dismantled in accordance with guidance of NASC - SG4 and Design should be in accordance with NASC - TG20:21. • Allow to remove existing roof covering in accordance with current asbestos management guidelines clearing all resultant debris from working area before starting to build and fix the ladders, fit the deck and install new plastics as per the pricing document Page 5 of 15 • The contractor shall review the asbestos R&D supplied and manage a specialist asbestos removals contractor to undertake the removal and disposal of any hazardous waste material. • Ensure that the removal of the existing roof covering including ACM sheets and all plastics inc guttering is compliant with current regulations. The removals contractor must have UKATA/IATP training qualifications for any unlicensed removals and provide consignment note upon completion of works. • Make and supply “ladders” fitted over concrete beams to provide fall of at least 5 degrees to the rear of the garages • Remove the all existing, soffits, facia and guttering including any associated fixtures and install the deck or waterproof covering with associated fixtures & fittings • Install new fascia around the building to conceal the roof ladders as well deepflow gutter with appropriate clips and fittings to the rear. Also supply and fit appropriate downpipe, with appropriate clips and fittings, to the rear of the property with a minimum 2 down pipes and all clips to be a maximum 1 metre apart

Source officielle

Source : Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Find a Tender Service (UK Cabinet Office / Crown Commercial Service) il y a 1 mois

Documents sur Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (anglais)

Plus de cet acheteur

Profil complet de l'acheteur

Attributions récentes

Marchés similaires

Contexte de marché

Historique de l'acheteur sur Aperlena
28 avis suivis · 25 attribués
1 355 021 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

2 463 nouveaux avis pour tous les secteurs en Royaume-Uni au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer