Saltar al contenido
Aperlena

CAS-01336-R8D9H5 - GARAGE BLOCK Flats 1-12 Gablehurst, Upton, Poole, BH16 5JA - Roofline Renewal

Adjudicada Adjudicación de contrato Sin fecha límite publicada
Vigilar esta licitación

El plazo de ofertas ha cerrado. Una adjudicación o una corrección de este anuncio: un email cuando el registro lo ve. Iniciar sesión

  1. Publicada
  2. Adjudicada pendiente

Descripción

Project: The refurbishment of the main hipped roof • NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme. • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works • Temporarily close off working areas to exclude vehicles and pedestrians from the site using suitable signage and remove them upon the re-opening on completion of the works. • Provide scaffolding/staging as required to the properties to enable safe access to undertake all works outlined within the schedule in accordance with Working at Height Regs. 2005. All scaffolding is to be erected, managed and dismantled in accordance with guidance of NASC - SG4 and Design should be in accordance with NASC - TG20:21. • Allow to remove existing roof covering in accordance with current asbestos management guidelines clearing all resultant debris from working area before starting to build and fix the ladders, fit the deck and install new plastics as per the pricing document Page 5 of 15 • The contractor shall review the asbestos R&D supplied and manage a specialist asbestos removals contractor to undertake the removal and disposal of any hazardous waste material. • Ensure that the removal of the existing roof covering including ACM sheets and all plastics inc guttering is compliant with current regulations. The removals contractor must have UKATA/IATP training qualifications for any unlicensed removals and provide consignment note upon completion of works. • Make and supply “ladders” fitted over concrete beams to provide fall of at least 5 degrees to the rear of the garages • Remove the all existing, soffits, facia and guttering including any associated fixtures and install the deck or waterproof covering with associated fixtures & fittings • Install new fascia around the building to conceal the roof ladders as well deepflow gutter with appropriate clips and fittings to the rear. Also supply and fit appropriate downpipe, with appropriate clips and fittings, to the rear of the property with a minimum 2 down pipes and all clips to be a maximum 1 metre apart

Fuente oficial

Fuente: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Verifica siempre los detalles en el anuncio oficial.

Última verificación con Find a Tender Service (UK Cabinet Office / Crown Commercial Service) hace 1 mes

Documentos en Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (inglés)

Más de este comprador

Perfil completo del comprador

Adjudicaciones recientes

Licitaciones similares

Contexto de mercado

Historial del comprador en Aperlena
28 anuncios registrados · 25 adjudicados
1.355.021 € en contratos adjudicados

No te pierdas ninguna licitación como esta

2.461 anuncios nuevos de todos los sectores en Reino Unido en los últimos 7 días. Recibe un email cuando aparezcan anuncios nuevos. Gratis.

Crear mi alerta

Atajos de teclado

Recorre una lista sin tocar el ratón. Los atajos no actúan mientras escribes en un campo.

j
Resultado siguiente
k
Resultado anterior
Intro
Abrir el resultado
n
Página siguiente
p
Página anterior
c
Comparar este resultado
s
Añadir este resultado a la lista corta
/
Ir al cuadro de búsqueda
?
Mostrar estos atajos
Esc
Cerrar