Skip to content
Aperlena

Validation tests for NMC batteries

Open Contract notice 4 days left
Watch this tender

Deadline 21 Sep. If it moves, an email when the register sees it. A correction: the same email. Log in

  1. Published
  2. Today
  3. Deadline open for 15 days
  4. Awarded pending

Summary

Machine-generated summary

The contract covers a service for testing NMC-type Li-ion batteries intended for use in Low Entry and Normal Floor intercity buses. Testing concerns a single battery system with a capacity of 399 Ah and a rated voltage of 670 V. The scope includes electrical and environmental tests such as cycling, power tests and temperature tests, assessment of BMS functionality, analysis of operating parameters across various temperature ranges and SOC levels, and assessment of charge and discharge performance. The work supports a project developing an innovative family of hydrogen-electric intercity buses. A notice of amendment allows subcontracting only with the prior written consent of the Ordering Party; tenders are due by 21 September 2026.

Description

Numer ogłoszenia: 2026-7175-290830 Projekt: FENG.01.01-IP.01-A07U/24 - Opracowanie innowacyjnej rodziny wodorowo-elektrycznych autobusów Intercity Część 1: Validation tests for NMC batteries Notice of Amendment - 16.09.2026: The Ordering Party hereby informs bidders that an amendment has been introduced to the documentation. Previous wording of Section 4 (i) - Subcontracting: The Ordering Party does not permit the possibility of subcontracting works to entities other than the Tender. New wording of Section 4 (i) - Subcontracting: The performance of any part of the Contract by a subcontractor shall be permitted only with the prior written consent of the Ordering Party, following the identification of the subcontractor and the submission of a detailed description of the scope of work to be entrusted to it. The Contractor shall remain fully responsible for the acts and omissions of any subcontractor as if they were its own. No other provisions of the procurement documentation are amended. The deadline for the submission of tenders remains unchanged and is set for 21 September 2026. Description of the subject of the contract a. Brief description of the subject of the contract: The subject of the contract is a service involving the testing of NMC-type Li-ion batteries intended for use in Low Entry and Normal Floor intercity buses. The tests will involve verifying the key electrical and physical parameters of the batteries in order to confirm their safety and reliability. The work will be carried out as part of a project aimed at developing an innovative range of hydrogen-electric intercity buses. The test subject comprises a single battery system with a capacity of 399 Ah and a rated voltage of 670 V. The scope includes: • Electrical and environmental tests (cycling, power tests, temperature) • Assessment of BMS functionality • Analysis of operating parameters across various temperature ranges and SOC levels • Assessment of charge and discharge performance, operation in bus driving conditions, internal resistance, cell balancing efficiency, and temperature distribution • Preparation of a report which consist of: o general information about the Contactor, o the test station and equipment description (with parameters) and photographical documentation of it, o detailed tests time-line, product preparation details and product parameters, o description of each test step with parameters and the procedure, o results of each test presentation i.e. graphical or tabular, o summary of each test part, o all parts results and summary, o final conclusions with key findings and recommendations. b. Purpose of the contract: The aim of the contract is to develop and optimize a new generation of NMC battery systems. Conducting these tests will enable the identification and implementation of innovative solutions that enhance battery performance, safety and lifespan, which is crucial for improving the overall performance and reliability of future bus models. c. Detailed description of the subject of the contract: • HV Safety tests - earthing verification, resistance measurements, dielectric strength, BMS functionality, visual inspection • Tests - Part 1 at 25°C: o 5 full charge and discharge cycles, charged at a maximum current of 0.3C and current map, terminated when maximum cell voltage reach 4.086 V, discharge with 0.3C current terminated when minimum cell voltage reach 3.264V. o Pulse power tests. Pulse tests at 1C current every 10% SOC whilst discharging the battery in the range from 90% to 10% SOC with 0.3C current. Charged to 100% (CC-CV, 0.3C, cut-off when maximum cell voltage reach 4.086 V). o Bus driving profile cycling. Discharge/charge cycle in the range of 90%-10% SOC (charging/discharging pulses at 0.1-0.5C due to Ordering Party bus driving profile), and recharging to 100% at 1C). 1-hour break for cell balancing. The whole process repeated 9 times (overall 10 cycles). • Tests - Part 2 at 35°C ambient and coolant temperature: o 5 full charge and discharge cycles, charged at a maximum current of 0.3C and current map , terminated when maximum cell voltage reach 4.086 V. o Pulse power tests. Pulse tests at 1C current every 10% SOC whilst discharging the battery in the range from 90% to 10% SOC with 0.3C current. Charged to 100% (CC-CV, 0.3C, cut-off when maximum cell voltage reach 4.086 V). o Cycling. Discharge/charge cycle, discharge with 0.83C and charge with 0.86C and according to BMS limitation. Cycle between maximum cell voltage 4.086V for charge phase and minimum cell voltage 3.264V for discharge phase. 30-min break for cell balancing. The whole process repeated 99 times (overall 100 cycles). • Tests at different temperatures ranges: 25°C, 15°C, 5°C, 35°C and 45°C: 5 full charge and discharge cycles at each temperature range: 25°C, 15°C, 5°C, 35°C and 45°C, charged at a maximum cur Źródło: Ministerstwo Funduszy i Polityki Regionalnej, Baza Konkurencyjności Funduszy Europejskich; pobrano 2026-09-17; dane przetworzone.

Official source

Source: Baza Konkurencyjności Funduszy Europejskich (Ministerstwo Funduszy i Polityki Regionalnej)

Always verify details on the official notice.

Last verified against Baza Konkurencyjności Funduszy Europejskich (Ministerstwo Funduszy i Polityki Regionalnej) 14 hours ago

Documents on Baza Konkurencyjności Funduszy Europejskich (Ministerstwo Funduszy i Polityki Regionalnej) (Polish)

More from this buyer

Full buyer profile

This buyer has no award history in this sector yet. Usual winners, Electrical machinery - Poland

Company Wins Total awarded Last win
Agregaty Polska Cezary Bielak 16 €772,423 Sep 2026
Riello Delta Power Sp. z o.o. 11 n/a Sep 2026
Fast Group Sp. z o.o. 9 €641,235 Aug 2026
EVOLTO Sp. z o.o. 9 n/a Sep 2026
MACHTMANN POLSKA Sp. z o.o. 8 n/a Aug 2026

Based on 907 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Electrical machinery
€57,823,792
3,279 open across Europe right now
Buyer track record on Aperlena
1 notices tracked · 0 awarded

Never miss a tender like this

247 new notices in Electrical machinery in Poland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close