Summary
Machine-generated summaryThe buyer is procuring construction works for the Bahyse II+III school college in Blonay-St-Légier, Switzerland, with a specific lot covering MCR (measurement, control and regulation) installations. The MCR system will autonomously regulate natural ventilation of classrooms, be locally operable via a 16-inch screen integrated into the main control panel, and centralise all equipment in one panel in the basement technical room. The heating or ventilation contractor supplies only the equipment in its own submission, while the MCR contractor supplies the rest, including sensors and thermostats. Energy data will be recorded and shown graphically in real time.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile2 open tenders right now
- Bahyse II+III College in Blonay-St-Legier / Interior fittings 7 days left
- Switzerland - School building construction works - Bahyse II+III college - Blonay-St-Légier / Interior fittings 7 days left
Recent awards
- Suisse - Travaux de construction de bâtiments scolaires - Collège Bahyse II+III - Blonay-St-Légier / Menuiseries intérieures
- Suisse - Travaux de construction de bâtiments scolaires - Collège Bahyse II+III - Blonay-St-Légier / Plâtrerie-Peinture-Plafonds
- Suisse - Travaux de construction de bâtiments scolaires - Collège Bahyse II+III - Blonay-St-Légier / Installations CV
Similar tenders
Market context
- Avg. open tender · Construction work
- €31,848,072
- Buyer track record on Aperlena
- 17 notices tracked · 11 awarded
- €15,480,865 in awarded contracts
Never miss a tender like this
369 new notices in Construction work in Switzerland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert