Summary
Machine-generated summaryThe contracting authority in Poland is procuring the continuation of meteorological measurements and the periodic preparation of reports, tables and descriptive summaries, which must be sent to the contracting authority under the conditions set out in the contract. Two optional services are also envisaged: Optional Order No 1, the preparation of a Meteorological Study for the location of the Central Transport Hub (CPK) based on data and reports from the Meteorological Station, and Optional Order No 2, the relocation of the Meteorological Station at the contracting authority's request.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 6 days ago
More from this buyer
Full buyer profile51 open tenders right now
- Laboratory research services - Laboratory and field testing services for construction works under the contract 'Construction of the Central Transport Hub (CPK) with necessary facilities - construction of the railway siding on the section: railway line no. 3 - Central Transport Hub' 1 day left
- Software packages and IT systems - Purchase of subscription to design platform and software with support and development services 26 days left
- Construction works - Construction of power supply infrastructure for the Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C substation building, generator substation buildings and 110 kV cable lines No deadline published
Recent awards
- Construction of complete buildings or parts thereof and civil and water engineering works - Relocation of the PG-31 ditch channel with reconstruction of drainage facilities and construction of a dry flood-retention reservoir on the final section of the relocated PG-3 ditch
- Laboratory testing services - Laboratory and field testing for the construction of a long-distance rail tunnel in Lodz
- Roboty budowlane - Budowa konstrukcji komory Fabrycznej PLK w ramach Projektu „Budowa tunelu dalekobieżnego w Łodzi w ciągu linii kolejowej nr 85 wraz z włączeniem w linię kolejową nr 14 - budowa konstrukcji oporowej komory Retkinia oraz konstrukcji oporowej komory rozjazdowej Fabryczna"
Similar tenders
Market context
- Avg. open tender · Architecture & engineering services
- €9,326,872
- Buyer track record on Aperlena
- 102 notices tracked · 24 awarded
- €186,869,001 in awarded contracts
Never miss a tender like this
454 new notices in Architecture & engineering services in Poland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert