Summary
Machine-generated summaryThe buyer is procuring preparation and implementation of renewable energy installations, split into two lots. Lot 1 covers the preparation of a feasibility study (elaborate) on the economic viability of installing in-pipe hydro power stations on a pipeline. Lot 2 covers the preparation of a feasibility study on the economic viability of building photovoltaic power plants (FNE). Small businesses with relevant expertise in energy studies may bid, subject to the conditions set out in the tender documents.
Description
Official source
Source: e-Nabavke (Agencija za javne nabavke BiH)
Always verify details on the official notice.
Last verified against e-Nabavke (Agencija za javne nabavke BiH) 2 weeks ago
More from this buyer
Full buyer profile11 open tenders right now
- 160/26 - Devices for starting pump units 2 days left
- 150/26 Specific physical-chemical analyses 2 days left
- 165/26 Separation works 2 days left
Similar tenders
2
days left
€4,562
est. value
2
days left
€6,136
est. value
Market context
- Avg. open tender · Architecture & engineering services
- €9,510,421
- Buyer track record on Aperlena
- 23 notices tracked · 0 awarded
Never miss a tender like this
21 new notices in Architecture & engineering services in Bosnia & Herzegovina in the last 7 days. Get an email when new ones appear. Free.
Set up my alert