Skip to content
Aperlena

Ireland - Electrical installation work - CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

Awarded Contract award No deadline published
Watch this tender

Bidding is closed. An award or a correction on this notice: an email when the register sees it. Log in

  1. Published
  2. Awarded pending

Description

In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

6 open tenders right now

Recent awards

Similar tenders

Market context

Avg. open tender · Construction work
€31,242,587
25,963 open across Europe right now
Buyer track record on Aperlena
360 notices tracked · 59 awarded
€10,574,737 in awarded contracts

Never miss a tender like this

35 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close