Skip to content
Aperlena

Ireland - Construction work - Multi-Party Framework Agreement for Design and Build Works Contractors for Large-Scale Social Housing Projects (over EUR 5m) for Cork County Council

Original Ireland - Construction work - Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Cork County Council in Ireland is establishing a Multi-Party Framework Agreement for design and build contractors to deliver large-scale social housing projects with an estimated value over EUR 5 million and no upper limit. The framework, valued at approximately EUR 250 million, will appoint seven contractors using Modern Methods of Construction such as volumetric units and panelised systems. The first project is 45 social housing units at Broomfield West, Midleton, Co. Cork. Contractors must provide multidisciplinary design team services. Projects will be awarded by mini-competition. No deadline is stated and there is no guarantee of subsequent contracts under the framework.

Description

Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer - Architectural Services (Contractor Design Specialist), including PSDP • Designer - Civil and Structural Engineering Services (Contractor Design Specialist) • Designer - Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

9 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Ireland

Company Wins Total awarded Last win
TRIUR Construction Limited 20 €107.4M Aug 2026
Roadstone Ltd 12 €12.8M Sep 2026
Carra Plant Hire Ltd 12 €1.7M Sep 2026
Jons Civil Engineering Company Limited 9 €45.3M Aug 2026
Global Rail Services Ltd 9 €7.7M Sep 2026

Based on 899 awards with a linked company profile over the last 2 years.

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Read before bidding
    • Estimated value: Set to €250,000,000
    • Estimated value: Set to €250,000,000

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Market context

Avg. open tender · Construction work
€32,560,951
31,108 open across Europe right now 668% above sector average
Buyer track record on Aperlena
828 notices tracked · 361 awarded
€121,365,796 in awarded contracts

Never miss a tender like this

36 new notices in Construction work in Ireland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close