Summary
Machine-generated summaryThe buyer, referred to as the Owner, plans to install two Onshore Power Supply systems, each rated at 12 MVA, for cruise ships in Iceland. The tender covers the OPS power transformation system, electrical engineering for shore side connection cabinets, and overall system testing. The solution must use stackable 30-foot container modules and handle specific power, load, and seismic conditions. An external structure built by others will enclose the OPS containers. Bidders should consult the technical specification document for more details.
Description
Official source
Source: TED - Tenders Electronic Daily (Publications Office of the EU)
Always verify details on the official notice.
Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago
More from this buyer
Full buyer profile2 open tenders right now
- Fuels - Purchaser of fuel 2026 18 days left
- Architectural, engineering and planning services - New Harbour Building (Nýtt Hafnarhús) No deadline published
Similar tenders
Market context
- Avg. open tender · Electrical machinery
- €54,234,984
- Buyer track record on Aperlena
- 5 notices tracked · 0 awarded
Never miss a tender like this
1 new notice in Electrical machinery in Iceland in the last 7 days. Get an email when new ones appear. Free.
Set up my alert