Skip to content
Aperlena

Municipality of Uznach: Tender for general planner excluding electrical planning - Renovation of stormwater retention basin and pumping station Escherwis

Original Gemeinde Uznach: Submission Generalplaner exkl. Elektrofachplanung- Sanierung RÜB/PW Escherwis

Open Contract notice 3 days left
Watch this tender

Deadline 28 Sep. If it moves, an email when the register sees it. A correction: the same email. Log in

  1. Published
  2. Today
  3. Deadline open for 56 days
  4. Awarded pending

Summary

Machine-generated summary

The Municipality of Uznach, together with the Abwasserverband Obersee wastewater association, is procuring a general planner for the renovation of the Escherwis stormwater retention basin and pumping station. The ageing structure requires renewal of installations, equipment and building fabric while keeping its stormwater retention function, plus operational improvements such as roofing the open pumping station and relocating the transformer station. A preliminary project (SIA phase 31) with cost estimate by Holinger AG already exists; phases 32 to 53 are to be prepared by the general planner, excluding electrical planning services due to many interfaces with other projects.

Description

Das Aussenbauwerk Regenüberlaufbecken (RÜB) / Pumpwerk (PW) Escherwis ist aufgrund seines Alters sanierungsbedürftig.   Beim RÜB / PW Escherwis ist neben dem Ersatz der Installationen und Ausrüstungen auch die Bausubstanz Instand zu stellen. Die Funktion des Regenüberlaufbeckens soll beibehalten werden. Im Zuge der Sanierung sollen zudem auch einige betriebliche Optimierungen umgesetzt werden, beispielsweise die Überdachung des offenen Pumpwerkes und die Versetzung der Trafo-Station.   Für das RÜB / PW Escherwis wurde durch die Holinger AG ein Vorprojekt (SIA-Phase 31) für den Umbau mit Kostenvoranschlag ausgearbeitet (siehe Beilage A), in dem alle Sanierungs- und Optimierungs-Massnahmen detailliert aufgeführt sind. In Zusammenarbeit mit der Gemeinde Uznach und dem Abwasserverband Obersee sollen nun die Phasen 32 - 53 von einem Generalplaner erarbeitet werden. Davon ausgenommen sind wegen der vielen Schnittstellen zu anderen Projekten die Leistungen des Elektrofachplaners. 

Official source

Source: simap.ch - Swiss public procurement platform

Always verify details on the official notice.

Last verified against simap.ch - Swiss public procurement platform 1 month ago

More from this buyer

Full buyer profile

This buyer has no award history in this sector yet. Usual winners, Environment, sewage & cleaning - Switzerland

Company Wins Total awarded Last win
FR_TOPNET SA 17 €3.2M Jun 2026
FR_ISS Facility Services SA 11 €38.1M Sep 2026
FR_Globe Nettoyage Sàrl 9 €356,621 Jun 2026
DE_Honegger AG 6 €12.3M Aug 2026
FR_Messerli Services SA 6 €5.5M Jun 2026

Based on 258 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Environment, sewage & cleaning
€9,115,803
5,311 open across Europe right now
Buyer track record on Aperlena
4 notices tracked · 2 awarded
€277,286 in awarded contracts

Never miss a tender like this

23 new notices in Environment, sewage & cleaning in Switzerland in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close