Summary
Machine-generated summaryThe Municipality of Flirsch is procuring construction works for the relocation of its water supply system serving the settlement area. The works include the installation of approximately 138 linear metres of water pipeline in DA 125 PE PN 16 with a cover depth of 1.50 m, 3 house connections in DN 5/4 inch PE PN 16, likewise with 1.50 m cover depth, approximately 200 linear metres of fibre optic protection pipe DN 50, and approximately 200 linear metres of 7 x 10 fibre optic composite cable. The scope covers all pipeline and cable laying works described in the notice.
Description
Official source
Source: AUSSCHREIBUNG.AT (Hubexo Austria GmbH)
Always verify details on the official notice.
Last verified against AUSSCHREIBUNG.AT (Hubexo Austria GmbH) 43 minutes ago
The official portal may ask for a free registration before downloading.
More from this buyer
Full buyer profile2 open tenders right now
- Municipality of Flirsch water supply system renewal, Upper Kohlwald springs 1 and 2 No deadline published
This buyer has no award history in this sector yet. Usual winners, Construction work - Austria
| Company | Wins | Total awarded | Last win |
|---|---|---|---|
| PORR Bau GmbH | 54 | €285.9M | Sep 2026 |
| STRABAG AG | 50 | €257.2M | Sep 2026 |
| SWIETELSKY AG | 38 | €380.9M | Sep 2026 |
| Tischlerei Scheschy GmbH | 20 | €49.7M | Sep 2026 |
| Leyrer + Graf Baugesellschaft m.b.H. | 15 | €81.7M | Sep 2026 |
Based on 1766 awards with a linked company profile over the last 2 years.
Similar tenders
Market context
- Avg. open tender · Construction work
- €32,562,838
- Buyer track record on Aperlena
- 2 notices tracked · 0 awarded
Never miss a tender like this
205 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.
Set up my alert