Skip to content
Aperlena

France - Construction works for power and heating plants - Construction of a geothermal plant in Fontenay-aux-Roses (92)

Original France - Travaux de construction de centrales électriques et de centrales thermiques - Construction d'une centrale de géothermie à Fontenay aux Roses (92)

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

The buyer is seeking a contractor to build a geothermal plant at 8 route du Panorama, Fontenay-aux-Roses (Hauts-de-Seine), France. The works cover detailed design, supply, installation, testing, commissioning and acceptance of all plant installations, including civil engineering and the process package: hydraulics, mechanics, pipework, plumbing, heating, heat exchangers, heat pumps, boilers, ventilation and air conditioning, as well as backup heat production, internal hydraulic distribution, electrical works, remote management and automation systems. No estimated value or submission deadline is stated in the available information. Only facts given in the notice are included here; interested companies should consult the full tender documents for procedure details and participation conditions.

Description

travaux de construction de la centrale de géothermie à Fontenay-aux-Roses (8 route du Panorama) ainsi que la fourniture, l'installation et la mise en service de l'ensemble des équipements la composant et notamment le génie civil, et le process (hydraulique, mécanique, tuyauterie, chaudières, pompes à chaleur ...) travaux de construction de la centrale de géothermie; Le présent lot comprend l'ensemble des prestations nécessaires à la conception détaillée, la fourniture, l'installation, les essais, la mise en service et la réception de toutes les installations des Tuyauterie, des Plomberies, de Chauffage, des échangeurs, Ventilation et Climatisation destinées : À la production thermique géothermique - À la valorisation par échangeurs et PAC - À la production d'appoint et de secours par chaufferie - À la distribution hydraulique interne - À l'alimentation EF des locaux techniques de la centrale, Il couvre l'intégralité du cycle hydraulique, depuis la sortie des équipements de production jusqu'aux usages techniques et sanitaires.; Le dimensionnement, la commande, la fourniture, l'approvisionnement, le stockage, la pose et la mise en service des pompes à chaleur destinées à la Centrale de Géothermie; prestation électrique, des systèmes de télégestion et d'automatisme à mettre en oeuvre pour les installations de la centrale géothermique

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

2 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - France

Company Wins Total awarded Last win
COLAS FRANCE 882 €533.1M Sep 2026
IDVERDE 181 €80.6M Sep 2026
EUROVIA BRETAGNE 129 €67.4M Sep 2026
SMAC 128 €33.8M Sep 2026
SOPREMA ENTREPRISES 95 €25.1M Sep 2026

Based on 37080 awards with a linked company profile over the last 2 years.

Change history

Every time an official source republished this notice with different content. We watch every source we index, including regional copies of the same notice.

  1. Read before bidding
    • Scope and criteria: The description was expanded. Re-read it before you bid.

Follow this tender and we email you the moment it changes. Create account

Similar tenders

Market context

Avg. open tender · Construction work
€31,337,817
25,447 open across Europe right now
Buyer track record on Aperlena
3 notices tracked · 1 awarded
€20,000,000 in awarded contracts

Never miss a tender like this

2,127 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close