Summary
Machine-generated summaryThis tender seeks project management (design and supervision) studies for the relocation of the water intake at the Milly drinking water production plant in Grandparigny, France, together with studies for restoring ecological continuity at the site. Businesses able to provide engineering and environmental design services may follow up on the original French notice for full conditions, criteria, and dates before preparing a bid.
Official source
Source: BOAMP - Bulletin officiel des annonces de marchés publics (DILA)
Always verify details on the official notice.
Last verified against BOAMP - Bulletin officiel des annonces de marchés publics (DILA) 1 month ago
More from this buyer
Full buyer profile5 open tenders right now
- Works relating to water supply pipelines - Framework agreement with purchase orders and subsequent contracts for the renewal, improvement or extension of drinking water networks and associated structures 17 days left
- Telecommunications services - Installation of volumetric water meters of 15 and 20 mm calibres fitted with a radio read-out module, with removal and replacement of old meters 22 days left
- Supply of a fixed leak pre-localisation system for continuous monitoring of the drinking water network in the commune of Pontorson for the SDEAU 50 authority 31 days left
Recent awards
Similar tenders
1
day left
€170,000
est. value
Market context
- Buyer track record on Aperlena
- 26 notices tracked · 11 awarded
- €2,236,246 in awarded contracts
Never miss a tender like this
2,830 new notices in all sectors in France in the last 7 days. Get an email when new ones appear. Free.
Set up my alert