Skip to content
Aperlena

Denmark - Pipeline inspection - IA_IRM ROV_26-34_FA

Original Danmark - Inspektion af rørledninger - IA_IRM ROV_26-34_FA

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

Ørsted plans a new frame agreement for bi-annual ROV inspection with planned call-offs in 2027, 2029 and 2031, optionally 2033, though not limited to those years. The scope covers the two Ørsted owned and operated 24 inch and 30 inch offshore gas pipelines, including subsea structures, risers and spools, plus the 20 inch offshore oil pipeline. Work includes IRM ROV inspections, visual inspection, CP stabbing, cleaning of marine growth, and optional tasks such as flooded member detection and removal of seabed objects. Each call-off, including mobilisation and demobilisation, is expected to last 5 to 10 days. A DP2 ROV support vessel with work class, observation class and mini ROVs is required. The final scope is defined in each call-off.

Description

Ørsted are planning for a new frame agreement with bi-annual ROV inspection with planned call-offs in 2027-2029-2031 optional 2033, but not limited to call-off in these specific years. The ROV IRM scope will be at the two Ørsted owned and operated 24” and 30” offshore gas pipelines including subsea structures, risers and spools and the 20” offshore oil pipeline. 2.3.5 Inspection services. Contractor shall perform inspections including but not limited to: IRM ROV inspection work according to Ørsted, inspections Sheets, Visual Inspection, CP stabbing, Cleaning of Marine Growth. And optional but not limited to scope for: Removal of seabed objects, Flooded member detection (FMD), FIGS pipeline and structure CP task, Other ROV task. Please note, that above scope is preliminary and a subject of change. The scope / tasks are not limited to above. The final scope will be defined in each call-off. Contractor shall perform the work in accordance with the procedures, specifications and re-quirements set out in Ørsted but not limited to this. In undertaking this work Contractor shall engineer his activities in such a way, that it will include all and any on- and offshore work required to perform the scope of work. Expected duration for execution including mobilization and demobilization per call-off is 5 - 10 days. Vessel and equipment: Vessel that can operate safely in the North Sea area, Operation and management of DP2 ROV support vessels, Vessel that can be approved an operated after Marine Operation Procedures (TotalEnergies, INEOS, and Ørsted), ROVS onboard: WROV, OROV and Mini ROV, High pressure subsea cleaning equipment.

Official source

Source: TED - Tenders Electronic Daily (Publications Office of the EU)

Always verify details on the official notice.

Last verified against TED - Tenders Electronic Daily (Publications Office of the EU) 1 month ago

More from this buyer

Full buyer profile

2 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Oil & gas industry services - Denmark

Company Wins Total awarded Last win
Akut TV ApS 1 €3.4M Apr 2026
Quest Integrity NLD B.V. 1 €805,000 Jun 2026
Ocean Infinity AB 1 n/a Oct 2024

Based on 3 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Oil & gas industry services
€17,519,447
82 open across Europe right now 54% below sector average
Buyer track record on Aperlena
3 notices tracked · 1 awarded

Never miss a tender like this

No new notices in Oil & gas industry services in Denmark in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close