Machine-generated summaryThe contract was awarded on 16 September 2022 for consulting services under the North Macedonia Public Sector Energy Efficiency Project, financed by the World Bank through loan IBRD-90380. The winning firm, KVADAR DOO SKOPJE, is to divide the existing detailed design for the reconstruction and renovation of the PHI University Clinic of Psychiatry in Skopje into two phases. The procurement method was direct selection, reference MK-MOF-001-2022-CS-DS. The signed contract price is MKD 335,120.00 in Macedonian denars, equal to the final evaluation price. The contract lasts 45 days. The status of the notice is contract awarded.