Skip to content
Aperlena

Design and build for the construction of 31 timber homes 'Mouncaout II' in Castets

Original Conception réalisation pour la construction de 31 logements bois « Mouncaout II » à Castets

Open Contract notice 9 days left
Watch this tender

Deadline 29 Sep. If it moves, an email when the register sees it. A correction: the same email. Log in

  1. Published
  2. Today
  3. Deadline open for 23 days
  4. Awarded pending

Summary

Machine-generated summary

The buyer is procuring design and build services for a modular off-site timber housing development of 31 homes at the 'Mouncaout II' subdivision in Castets, France. The scheme includes 18 social rental flats in one or two buildings of up to three storeys on plot BE 137 (9 two-room and 9 three-room flats, each with a terrace or balcony) and 13 single-storey houses sold under a BRS scheme on plots BE 83 and BE 104 (4 three-room and 9 four-room houses with garage, terrace and cellar). The works are in two phases: one for the rental flats and one for the houses. Estimated value, deadline and procedure details are not specified in the notice.

Description

Opération de construction de 31 logements en construction modulaire bois hors site dans le lotissement Mouncaout II sur la commune de Castets. Cette opération comporte 18 logements locatifs sociaux en collectif et 13 maisons individuelles en BRS au lotissement et se décompose de la façon suivante : Pour les 18 logements locatifs sociaux sur le lot cadastré BE 137 d’une surface de 2 159m², un ou deux immeubles à R+2 comprenant au total : - 9 T2 de 49 m² de surface habitable chacun avec terrasse ou balcon de 6 m² minimum - 9 T3 de 64 m² de surface habitable chacun avec terrasse ou balcon de 6 m² minimum Pour les 13 logements individuels groupés en deux bandes de 6 (sur le lot cadastré BE 83 de 2 521m²) et 7 (sur le lot cadastré BE 104 de 2 938m²) logements de plain-pied comprenant au total : - 4 T3 de 67 m² de surface habitable chacun avec terrasse et garage - 9 T4 de 82 m² de surface habitable chacun avec terrasse et garage Chaque BRS dispose d’un garage de 12 m² et d’une terrasse de plain-pied de 8 m² minimum avec un cellier extérieur attenant d’environ 3m² et intégré au volume de la toiture. Opération en 2 tranches : 1 pour les LLS et 1 pour le BRS.

Official source

Source: BOAMP - Bulletin officiel des annonces de marchés publics (DILA)

Always verify details on the official notice.

Last verified against BOAMP - Bulletin officiel des annonces de marchés publics (DILA) 1 week ago

Documents on BOAMP - Bulletin officiel des annonces de marchés publics (DILA) (French) bids submitted through Buyer profile (profil d'acheteur) linked on each notice

The official portal may ask for a free registration before downloading.

More from this buyer

Full buyer profile

7 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - France

Company Wins Total awarded Last win
COLAS FRANCE 882 €533.8M Sep 2026
IDVERDE 181 €80.6M Sep 2026
EUROVIA BRETAGNE 129 €67.4M Aug 2026
SMAC 128 €33.8M Sep 2026
SOPREMA ENTREPRISES 94 €25.0M Aug 2026

Based on 36947 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€33,193,450
31,089 open across Europe right now
Buyer track record on Aperlena
13 notices tracked · 0 awarded

Never miss a tender like this

3,793 new notices in Construction work in France in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close