Skip to content
Aperlena

ARA Zirl mechanical equipment for sludge dewatering

Original ARA Zirl maschinelle Ausrüstung Schlammentwässerung

Open Contract notice No deadline published
Watch this tender

We email you if the deadline moves or a correction is published. Free. Log in

Summary

Machine-generated summary

The works concern the mechanical equipment of the sludge dewatering stage at the Zirl wastewater treatment plant. The scope includes construction of a container system on the roof of the sludge dewatering building, with space reservation and connections for a filtrate screening unit at the filtrate outlet. A new sludge discharge system distributing to 4 containers will be installed, and the polymer preparation station for powder and liquid PE will be renewed. Piping works cover sludge feed from the existing system to the new machine, polymer dosing to the forced mixer upstream of the decanter, and the decanter filtrate outlet connection to the existing filtrate line. Further works include a rinse water outlet branch into the existing dirty water line, 2 motor-driven automatic gate valves for automatic switchover during decanter start-up and shutdown, renewal of the sludge feed pumps in the basement, and renewal of the macerator.

Description

Errichtung einer Containeranlage auf dem Dach des Schlammentwässerungsgebäudes Platzreserve und Anschlüsse für eine Filtrat Siebanlage im Bereich des Filtrat Ablaufes - Errichtung eines neuen Schlammaustragsystems mit Verteilung auf 4 Container - Erneuerung Polymer Aufbereitungsstation Für Pulver- und Flüssig-PE. - Rohrverbindung Schlammbeschickung vom Bestand zur neuen Maschine - Rohrverbindung Polymerdosierung zum Zwangsmischer vor dem Dekanter - Rohrverbindung Filtrat Ablauf Dekanter an die bestehende Filtrat Ablaufleitung - Spülwasserablauf - Abzweigung aus der Filtratleitung und Einbindung in die bestehende Trübwasserleitung im Rohrschacht des Faulbehälters - 2 motorgetriebene Automatikschieber in der Filtrat- bzw. Spülwasserleitung zur automatischen Umschaltung beim An- und abfahren des Dekanters - Erneuerung der Schlammbeschickungspumpen im KG des Schlammgebäudes - Erneuerung des Mazerators im KG des Schlammgebäudes

Official source

Source: AUSSCHREIBUNG.AT (Hubexo Austria GmbH)

Always verify details on the official notice.

Last verified against AUSSCHREIBUNG.AT (Hubexo Austria GmbH) 5 hours ago

The official portal may ask for a free registration before downloading.

More from this buyer

Full buyer profile

4 open tenders right now

This buyer has no award history in this sector yet. Usual winners, Construction work - Austria

Company Wins Total awarded Last win
PORR Bau GmbH 54 €285.9M Sep 2026
STRABAG AG 50 €257.2M Sep 2026
SWIETELSKY AG 38 €380.9M Sep 2026
Tischlerei Scheschy GmbH 20 €49.7M Sep 2026
Leyrer + Graf Baugesellschaft m.b.H. 15 €81.7M Sep 2026

Based on 1771 awards with a linked company profile over the last 2 years.

Similar tenders

Market context

Avg. open tender · Construction work
€31,337,817
25,447 open across Europe right now
Buyer track record on Aperlena
5 notices tracked · 1 awarded
€900,375 in awarded contracts

Never miss a tender like this

201 new notices in Construction work in Austria in the last 7 days. Get an email when new ones appear. Free.

Set up my alert

Keyboard shortcuts

Read a list without reaching for the mouse. The shortcuts stay quiet while you type in a field.

j
Next result
k
Previous result
Enter
Open the result
n
Next page
p
Previous page
c
Compare this result
s
Shortlist this result
/
Jump to the search box
?
Show these shortcuts
Esc
Close