Public buyer
CHU Dijon Bourgogne
Main sectors
Publishing rhythm
O
N
D
J
F
M
A
M
J
J
A
S
Publishes most in March and September. Next likely wave: March 2027.
Based on 22 notices over the last 24 months.
Top winners
- MEOTEC 2 contracts €800,000
- BUREAU VERITAS CONSTRUCTION SAS 1 contract
- NAMIXIS; EIRL LEVEIL FRANCK (COFORSEC) 1 contract