Zum Inhalt springen
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) geprüft vor 1 Tag Auftragsbekanntmachung

Deutschland - Beratungsdienstleistungen für Wasserversorgung und Abwasser (ohne Bauleistungen) - Entwicklung relevanter Planungsinstrumente für Wassersicherheit und Klimaresilienz in städtischen Gebieten in Tansania (Output 2 und Output 3 von ProWaS)

Original Germany - Consulting services for water-supply and waste-water other than for construction - Development of relevant planning tools for water security and climate resilience in Urban Areas in Tanzania (Output 2 and Output 3 of ProWaS)

Offen Deutschland Umwelt, Abwasser & Reinigung

Auftraggeber Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Eckdaten

Veröffentlicht
Wettbewerb
Offenes Rennen
  1. Veröffentlicht

TED - Tenders Electronic Daily (Publications Office of the EU) veröffentlicht für diese Bekanntmachung keine Angebotsfrist. Zur offiziellen Bekanntmachung

Zur amtlichen Bekanntmachung Ausschreibung beobachten

Wir mailen Ihnen, wenn sich die Frist ändert oder eine Berichtigung erscheint. Kostenlos. Anmelden

Das Aperlena-Urteil

Offenes Rennen

Kein Anbieter dominiert: 19 verschiedene Unternehmen haben die letzten 22 vergleichbaren Aufträge dieses Auftraggebers in 5 Jahren gewonnen. Ein wirklich offenes Rennen.

Basierend auf 22 vergleichbaren Zuschlägen dieses Auftraggebers in dieser Branche über 5 Jahre. Jedes Urteil wird vor dem Ergebnis festgehalten und an der Zuschlagsbekanntmachung gemessen. Wie wir uns selbst bewerten.

Zusammenfassung

Maschinell erstellte Zusammenfassung

Die GIZ vergibt im Projekt 'Water Security and Climate Resilience for Urban Areas and their Catchments in Tanzania (ProWaS)', das im Auftrag des Bundesministeriums fürwirtschaftliche Zusammenarbeit und Entwicklung umgesetzt wird, Beratungsdienstleistungen. Der Auftragnehmer unterstützt die Weiterentwicklung und den Ausbau von Planungsinstrumenten des tansanischen Ministeriums für Wasser: Joint Town-level Master Planning, das Water Supply and Sanitation Authorities und Local Government Authorities bei gemeinsamer Planung und Investitionsentscheidungen anleitet, sowie Water Safety Planning, das Versorger hilft, Risiken, insbesondere aus dem Klimawandel, für Wasserqualität und -quantität zu erkennen und partizipative Maßnahmen zu entwickeln. Die Arbeiten erfolgen in Tansania mit dem Ministerium für Wasser, Basin Water Boards,.catchment-Komitees, Wasserversorgern und Kommunalverwaltungen. Klimaresiliente Water Safety Plans sind ausgeschlossen.

Beschreibung

GIZ has been commissioned to implement the project "Water Security and Climate Resilience for Urban Areas and their Catchments in Tanzania (ProWaS)" in Tanzania on behalf of the German Federal Ministry of Economic Cooperation and Development (BMZ). The Overall Objective of the project is the sustainable improvement of the population"s access to drinking water and sanitation services, as well as the management of water resources. GIZ"s political implementation partner is the Ministry of Water, and coordination subnational entities such as Basin Water Boards, Catchment Committees, Water Supply and Sanitation Authorities, and Local Government Authorities is also key to the project methodology. As part of the process to achieve universal access to water as envisioned in the Tanzania Development Vision 2025, water sector stakeholders, guided by the Ministry of Water, have introduced three instruments as part of the Water Sector Development Programme: (1) Joint Town-level Master Planning (JTPs): Assist Water Supply and Sanitation Authorities (WSSAs) and Local Government Authorities (LGAs) to coordinate joint planning and investment decisions to improve access to water and sanitation; (2) Water Safety Planning (WSPs): Guide WSSAs to identify risks (in particular climate-change) affecting water quality and quantity and develop mitigation measures to address these risks via a participatory approach; (3) Water Allocation Planning (WAPs): Guide Basin Water Boards (BWBs) to make equitable allocations of water resources for different water users and the environment. Note - the CR-WSPs are not in the scope of this contract. The JTPs and CR-WSPs are among the key performance indicators for Water Supply and Sanitation Authorities (WSSAs) in Tanzania and the WAPs are among the key performance indicators for BWBs in Tanzania. The Ministry of Water has requested the Federal German Government through ProWaS to upscale the JTPs and CR-WSPs to more urban areas and WSSAs as well as create new WAPs in Tanzania. The contractor will on behalf of the ProWaS project create 3 JTPs, and 3 WAPs in accordance with the respective guidelines prepared by the Ministry of Water. This will require close coordination with the GIZ Project Team in Tanzania as well as National, Regional, and Local Tanzanian water authorities. The JTPs are defined by the municipality (i.e. town) in a particular region, while the WAPs are defined by the basin and the sub-catchment. A team of national and international experts shall be provided by the Contractor for this purpose. GIZ has been commissioned to implement the project "Water Security and Climate Resilience for Urban Areas and their Catchments in Tanzania (ProWaS)" in Tanzania on behalf of the German Federal Ministry of Economic Cooperation and Development (BMZ). The Overall Objective of the project is the sustainable improvement of the population"s access to drinking water and sanitation services, as well as the management of water resources. GIZ"s political implementation partner is the Ministry of Water, and coordination subnational entities such as Basin Water Boards, Catchment Committees, Water Supply and Sanitation Authorities, and Local Government Authorities is also key to the project methodology. As part of the process to achieve universal access to water as envisioned in the Tanzania Development Vision 2025, water sector stakeholders, guided by the Ministry of Water, have introduced three instruments as part of the Water Sector Development Programme: (1) Joint Town-level Master Planning (JTPs): Assist Water Supply and Sanitation Authorities (WSSAs) and Local Government Authorities (LGAs) to coordinate joint planning and investment decisions to improve access to water and sanitation; (2) Water Safety Planning (WSPs): Guide WSSAs to identify risks (in particular climate-change) affecting water quality and quantity and develop mitigation measures to address these risks via a participatory approach; (3) Water Allocation Planning (WAPs): Guide Basin Water Boards (BWBs) to make equitable allocations of water resources for different water users and the environment. The JTPs and CR-WSPs are among the key performance indicators for Water Supply and Sanitation Authorities (WSSAs) in Tanzania and the WAPs are among the key performance indicators for BWBs in Tanzania. The Ministry of Water has requested the Federal German Government through ProWaS to upscale the JTPs and CR-WSPs to more urban areas and WSSAs as well as create new WAPs in Tanzania. The contractor will on behalf of the ProWaS project create 3 JTPs, and 3 WAPs in accordance with the respective guidelines prepared by the Ministry of Water. The CR-WSPs are not in the scope of this contract. This will require close coordination with the GIZ Project Team in Tanzania as well as National, Regional, and Local Tanzanian water authorities. The JTPs are defined by the municipality (i.e. town) in a particular region, while the WAPs are defined by the basin and the sub-catchment. A team of national and international experts shall be provided by the Contractor for this purpose. Through the completion of the three aforementioned Work Packages, the contractor is responsible for contributing to the Module Objective, Output 2, Output Indicator 2.2, and Output 3 and is responsible for achieving Module objective Indicator 3 and Output indicator 2.1 as described in this document. The Module Objective is, "The framework for improving water security in catchments of urban areas is adapted to the challenges of climate change." Output 2 is as follows: "Water and sanitation authorities, in collaboration with local consultants, have identified priority projects to improve access to climate-resilient water and sanitation services." It is accompanied by the following two indicators: Indicator 2.1: Fifteen JTPs have been drawn up by WSSA together with Local Government Authorities (base value of 5 JTPs exist, 7 others to be completed by project, three remaining to be completed by the contractor); Indicator 2.2 : In a survey, 16/30 stakeholders from Water Supply and Sanitation Authorities (WSSAs) and the MoW confirm the use of the gender-sensitive expert database in the development of JTPs, Water Safety Plans, and priority projects to improve access to climate-resilient water supply and sanitation services (16 positive responses). In addition, Module Objective Indicator 3 is as follows, "Water catchment authorities (3 total) have developed an evidence-based gender-sensitive Water Allocation Plan (WAP) in each selected sub-catchment (3 sub-catchments), based on current, climate-resilient hydrological data." Work Package 1 relates to Output 2 and the two corresponding indicators. Work Package 2 relates to Module Objective Indicator 3.

Amtliche Quelle

Quelle: TED - Tenders Electronic Daily (Publications Office of the EU)

Prüfen Sie alle Angaben stets in der amtlichen Bekanntmachung.

Einen Fehler in dieser Bekanntmachung melden

Zuletzt mit TED - Tenders Electronic Daily (Publications Office of the EU) abgeglichen vor 1 Tag

Was dieser Auftraggeber bisher gezahlt hat

Auf Basis von 11 vergleichbaren Auftraegen, die dieser Auftraggeber in dieser Branche in den letzten 4 Jahren vergeben hat.

Median der Zuschlaege
473.842 €
Mittlere Hälfte der früheren Zuschläge
320.165 € bis 525.138 €

TED - Tenders Electronic Daily (Publications Office of the EU) veröffentlicht für diese Bekanntmachung keinen Wert, deshalb hat sie keine Marke auf der Skala. Die offiziellen Unterlagen nennen ihn möglicherweise.

Juengste Zuschlaege

Auftragswerte wie von den amtlichen Quellen veroeffentlicht. Als Orientierung zu verstehen, nicht als Regel: Umfang, Lose und Laufzeit unterscheiden sich.

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Deutschland

Bekanntmachungen im Register
899
Zuschläge
368
insgesamt vergeben
105,7 Mio. €

Ein Punkt je Zuschlag, am Tag der Unterzeichnung, in der Größe seines Werts. Ein Ring ist ein Zuschlag ohne veröffentlichten Wert.

Wer die Aufträge dieses Auftraggebers in diesem Sektor gewöhnlich gewinnt

Unternehmen Zuschläge Vergebenes Volumen Letzter Zuschlag
GFA Consulting Group GmbH 3 Mai 2026
Dorsch Impact GmbH 2 Jun 2026
WISAG Gebäudereinigung Berlin GmbH & Co. KG; Connect2 Cleaning GmbH 1 690.940 € Dez 2025
TAG International 1 659.100 € Nov 2025
Consortium GOPA Tech GmbH - GOPA Worldwide Consultants GmbH 1 547.250 € Sep 2025

Grundlage: 22 Vergaben mit verknüpftem Unternehmensprofil aus den letzten 5 Jahren.

145 offene Ausschreibungen derzeit

Marktkontext

TED - Tenders Electronic Daily (Publications Office of the EU) veröffentlicht für diese Bekanntmachung keinen Wert, deshalb lässt sie sich unter den offenen Bekanntmachungen der Branche nicht einordnen. Die offiziellen Unterlagen nennen ihn möglicherweise.

jetzt offen im Bereich Umwelt, Abwasser & Reinigung
5.988
Median der offenen Bekanntmachungen
325.100 €

Ähnliche Ausschreibungen

Jetzt offen

Früher vergeben

Verpassen Sie keine Ausschreibung wie diese

4.337 neue Bekanntmachungen für Umwelt, Abwasser & Reinigung in Deutschland in den letzten 7 Tagen. Erhalten Sie eine E-Mail, wenn neue erscheinen. Kostenlos.

Benachrichtigung einrichten

Tastaturkürzel

Eine Liste lesen, ohne zur Maus zu greifen. In einem Eingabefeld bleiben die Kürzel stumm.

j
Nächstes Ergebnis
k
Vorheriges Ergebnis
Enter
Ergebnis öffnen
n
Nächste Seite
p
Vorherige Seite
c
Dieses Ergebnis vergleichen
s
Dieses Ergebnis auf die Merkliste setzen
o
Ergebnis in neuem Tab öffnen
x
Dieses Ergebnis beiseitelegen
/
Von jeder Seite aus suchen
Strg K
Von jeder Seite aus suchen
?
Diese Kürzel anzeigen
Esc
Schließen

Verzeichnis

Schließen
Anmelden

Sprache