Construction of the Wastewater Treatment Plant and the Sewerage Infrastructure in the Municipality of Soroca
Auftraggeber: National Office for Regional and Local Development
Land: Republik Moldau
Frist: 21 Okt 2025, 11:00 (UTC+3)
Verfahren: Offenes Verfahren
Aperlena: https://aperlena.com/de/t/construction-of-the-wastewater-treatment-plant-and-the-sewerage-infrastructure-in-the-municipality-of-soroca-5eea0e398e
Amtliche Bekanntmachung: https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00375951
Veröffentlicht
Frist53 Tage offen
Vergebenausstehend
Beschreibung
Project: P173076 - Moldova Water Security and Sanitation Project
Reference: MD-PIU-NORLD-506303-CW-RFB
Procurement method: Request for Bids
Financing: World Bank
Specific Procurement Notice
Request for Bids
Plant
Design, Supply and Installation
(Two-envelope Bidding Process, Without Prequalification)
Employer : Regional Development Agency North (RDA North)
Project : Moldova Water Security and Sanitation Project (MWSSP)
Contract title : Construction of the Wastewater Treatment Plant and the Sewerage Infrastructure in the Municipality of Soroca
Country : Republic of Moldova
Credit No .: 7027-MD
RFB No .: MD-PIU-NORLD-506303-CW-RFB
Issued on : August 29, 2025
1. The Government of the Republic of Moldova has received financing from the World Bank toward the cost of the Moldova Water Security and Sanitation Project (MWSSP), and intends to apply part of the proceeds toward payments under the Contract for Construction of the Wastewater Treatment Plant (WWTP) and the Sewerage Infrastructure in the Municipality of Soroca
2. The P.I. National Office for Regional and Local Development / MWSSP Implementation Unit now invites sealed Bids from eligible Bidders for Plant Design, Supply, Installation, Testing and Commissioning for Construction of the Wastewater Treatment Plant and the Sewerage Infrastructure in the Municipality of Soroca. The town of Soroca is the administrative centre of the Soroca Municipality, located on the right bank of the Dniester River, along the border with Ukraine, 160 km north of the capital Chisinau. The wastewater network is divided into 4 main catchments, connected to the Central wastewater pumping station (CPS). Two other wastewater pumping stations are located respectively on the northside (North Pumping Station, NPS) and on the southside of the city (South Pumping Station, SPS) with small catchment areas to pump the wastewater to the main network. At present, the untreated wastewater is discharged into the Dniester River via two outfalls located adjacent to the Central Pumping Station and the South Pumping Station. The overall objective of this project is to improve environment conditions in the Municipality and reduce pollution emission to the Dniester River and ensure full compliance with the relevant national and European legislation. The works envisaged under this Contract include the following:
all necessary surveys (wastewater flow and quality measuring campaign, geodetic and geo-technical surveys, etc.) as required for the preparation of detailed engineering design for physical, biological and advanced (removal of nutrients and pathogens) treatment facilities;
preparation of technical documentation as required by legislation of the Republic of Moldova for construction and technical acceptance of the works;
construction, supply and installation of equipment, pre-commissioning, testing and commissioning of the WWTP;
flood protection works at the WWTP site;
internal roads within the WWTP with connection to the public road;
construction, supply and installation of equipment, pre-commissioning, testing and commissioning of the Central and South Pumping Stations;
construction, supply, installation, pre-commissiong, testing and commissioning of pressure sewer mains from the Central Pumping Station to the WWTP and from the South Pumping Station to the gravity main sewer in the town.
The works shall be suitable for continuous operation during the designed lifetime, achieving full compliance with the guaranteed functional requirements at all times.
The Works will be implemented under a single contract based on the World Bank’s Standard Procurement Documents for Plant Design, Supply and Installation, dated February 2025.
The construction period is estimated to about 31 months from the contract signing.
3. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated November 2020 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations.
4. Interested eligible Bidders may obtain further information from Moldova Water Security and Sanitation Project and inspect the bidding document during office hours from 09:00 to 17:00 local time in Moldova at the address given below.
5. The bidding document in the English language may be purchased by interested eligible Bidders upon the submission of a written application to the address below and upon payment of a nonrefundable fee of EUR 50.00 ( fifty Euro, 00 eurocents or Moldovan Lei equivalent ), net of bank charges, in the case of distribution electronically or, EUR 200.00 ( Two Hundred Euro, 00 eurocents ) net of bank charges, in the case of courier delivery. A Proof of payment, in form of a SWIFT payment confirmation, shall be presented physically or through email, for delivery of the Bidding Document. The method of payment in both cases, will be by bank transfer. The payment detail
Amtliche Quelle
Quelle: World Bank - Procurement Notices (Bank-financed projects)
Prüfen Sie alle Angaben stets in der amtlichen Bekanntmachung.
Zuletzt mit World Bank - Procurement Notices (Bank-financed projects) abgeglichen vor 3 Wochen
Unterlagen auf World Bank - Procurement Notices (Bank-financed projects) (Englisch)