North Macedonia - Chargers - Supply of equipment - EV Chargers
Zamawiający: Centre for development of the South-East planning region
Kraj: Macedonia Północna
Termin: 14 kwi 2026, 16:00 (UTC+2)
Tryb: Przetarg nieograniczony
Branża (CPV): Maszyny elektryczne (31158000)
Aperlena: https://aperlena.com/pl/t/north-macedonia-chargers-supply-of-equipment-ev-chargers-81fb9cf72f
Ogłoszenie urzędowe: https://ted.europa.eu/en/notice/-/detail/106548-2026
Składanie ofert zakończone. Udzielenie zamówienia lub sprostowanie tego ogłoszenia: e-mail, gdy rejestr to zobaczy.
Zaloguj się
01
Opis
The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in the SouthEast of North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and asbuilt documentation must be delivered to ensure correct use, maintenance and longterm functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage lowcarbon mobility and contribute to the development of regional electric vehicle infrastructure.
The contract concerns the supply, delivery, installation, connection, testing and commissioning of six fast electric vehicle (EV) charging stations in North Macedonia, to be installed in the municipalities of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in accordance with the technical specifications defined in the tender documentation and shall fully comply with all applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery and installation of the EV charging stations with the technical characteristics defined in the tender specifications; • construction of foundation bases for each charging station; • electrical connection works, including cable lines, disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed equipment to ensure safe and proper operation. The contractor shall also provide training for designated local personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals and as-built documentation must be delivered to ensure correct use, maintenance and long-term functionality of the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote sustainable transport, encourage low-carbon mobility and contribute to the development of regional electric vehicle infrastructure.
Oficjalne źródło
Źródło: TED - Tenders Electronic Daily (Publications Office of the EU)
Zawsze weryfikuj szczegóły w oficjalnym ogłoszeniu.
Centre for development of the South-East planning region
Macedonia Północna
ogłoszeń w rejestrze
6
rozstrzygnięcie
1
łączna wartość udzielonych zamówień
298 980 €
20261