ITT - Swindon Archive Decarbonisation Design Team (UID 320)
Stazione appaltante: Historic England
Paese: Regno Unito
Valore stimato: 175.784 €
Procedura: Procedura ristretta
Settore (CPV): Lavori di costruzione (45262640)
Aperlena: https://aperlena.com/it/t/itt-swindon-archive-decarbonisation-design-team-uid-320-7b054860c4
Avviso ufficiale: https://www.find-tender.service.gov.uk/Notice/095864-2026
Ti scriviamo se cambia la scadenza o esce una rettifica. Gratis.
Accedi
01
Descrizione
Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).
The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind.
The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity.
A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care.
Based on the information provided, Historic England's preferred option currently involves:
• Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions.
• Rationalisation of archive environmental zones to improve operational efficiency.
• Fabric improvements to enhance thermal performance and airtightness.
• Fire safety upgrades and associated building works.
• Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth.
Scope of Services
The appointed design team will be required to lead the project through:
RIBA Stage 3 - Spatial Coordination
Including but not limited to:
• Review and validation of the completed RIBA Stage 2 outputs.
• Development of the preferred design solution.
• Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions.
• Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations.
• Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design.
• Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios.
• Planning application preparation and submission.
• Cost planning and value management exercises.
• Development of a robust whole-life cost and carbon assessment.
• Stakeholder engagement and workshop facilitation.
• Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.
Fonte ufficiale
Fonte: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)
Il committente ha troppo poche aggiudicazioni proprie in questo settore: questo è l'intervallo delle ultime 1.258 aggiudicazioni per Lavori di costruzione (Regno Unito).
1 €979,4 Mln €
Questo avviso
175.784 €
Importo mediano
309.165 €
Metà centrale delle aggiudicazioni passate
da 109.089 € a 1,1 Mln €
La stima rientra nell'intervallo abituale.
Importi di aggiudicazione come pubblicati dalle fonti ufficiali. Da usare come riferimento, non come regola: oggetto, lotti e durata variano tra i contratti.
degli appalti è andato ai tre aggiudicatari più frequenti
21%
delle sue gare indicano un valore stimato
91%
Sulla base di 14 aggiudicazioni con aggiudicatario indicato negli ultimi 3 anni. Contate per aggiudicazione e non per importo, perché gli importi di lotti e accordi quadro non sono confrontabili.
Concentrato: i tre aggiudicatari più frequenti hanno ottenuto il 65% degli appalti o più; molti fornitori: meno del 35% con almeno dieci aggiudicatari diversi.
20262
Un punto per aggiudicazione, nel giorno della firma, grande quanto il suo importo. Un anello è un'aggiudicazione senza importo pubblicato.
Questo committente non ha ancora aggiudicazioni registrate in questo settore. Aggiudicatari abituali, Lavori di costruzione - Regno Unito
Più grande del 28% degli avvisi aperti in Lavori di costruzione in Europa.
i più piccolii più grandi
aperti ora in Lavori di costruzione
19.945
avviso aperto mediano
550.669 €
Chi vince in questo mercato
Molti fornitori
Regno Unito · Lavori di costruzione
aziende diverse hanno vinto appalti qui
826
degli appalti è andato ai tre aggiudicatari più frequenti
6%
stazioni appaltanti hanno aggiudicato appalti qui
388
Sulla base di 1.475 aggiudicazioni con aggiudicatario indicato negli ultimi 3 anni. Contate per aggiudicazione e non per importo, perché gli importi di lotti e accordi quadro non sono confrontabili.
Concentrato: i tre aggiudicatari più frequenti hanno ottenuto il 65% degli appalti o più; molti fornitori: meno del 35% con almeno dieci aggiudicatari diversi.