Vai al contenuto
Aperlena

Ireland - Railway construction works - TII424: OCS Works Framework Agreement

Aggiudicata Avviso di aggiudicazione Nessuna scadenza pubblicata
Segui questa gara

Le offerte sono chiuse. Un'aggiudicazione o una rettifica su questo avviso: un'email quando il registro lo vede. Accedi

  1. Aggiudicata
  2. Pubblicata

Descrizione

TII intends to enter into a Single Party Framework Agreement for renewals (Overhead Contact System) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities:1. Design, supply, installation, testing and commissioning of any Overhead Contact System asset renewals, upgrades or new works. It shall include developing a detailed construction design associated with the various work elements of the Overhead Contact System installations on Luas 2. Developing the specific programme of works, 3. Developing the specific methodology - location based, 4. Developing the Traffic Management design - to be approved by the relevant Local Authority, TII and the Luas Operator, 5. Interface with Luas Operator and Maintainer as required, 6. Carrying out all the necessary works as specified for the Overhead Contact System and/or associated equipment and installations on Luas. Those works will include all preparatory works and all closing out works to make good the affected assets, 7. Production of the Safety File, 8. Supply of materials including contact wire and overhead system components and tooling e.g. Section insulators, cabling, fixings, poles, track interfacing equipment, sealants/grouts and materials used for works on or near the Luas system, and 9. Any other associated works required by the Client; including work on overhead contact system and traction power related equipment such as overhead contact system elements, cabling including traction cables, earthing and bonding systems (e.g. VLDs etc), installation, purchase, interventions of similar equipment, work on on-track-plant, supply of and interventions on tooling, interventions on overhead contact systems such as replacing contact wire, adjusting overhead support systems, work on supporting systems and additional items on surrounding building such as poles and building supports and all works on or near Luas OHLE (Overhead line equipment) asset group, 10. Provide a handover file and as-built drawings in accordance with TII requirements . 11. Carrying out the duties of PSDP and PSCS for all Call off Contracts. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Pre-qualification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.

Fonte ufficiale

Fonte: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica sempre i dettagli nell'avviso ufficiale.

Ultima verifica su TED - Tenders Electronic Daily (Publications Office of the EU) 2 settimane fa

Altro da questo committente

Profilo completo del committente

17 gare aperte in questo momento

Aggiudicazioni recenti

Gare simili

Contesto di mercato

Gara aperta media · Lavori di costruzione
33.193.450 €
31.089 aperte ora in Europa 171% sopra la media del settore
Storico della stazione appaltante su Aperlena
176 avvisi tracciati · 126 aggiudicati
887.430.541 € in contratti aggiudicati

Non perderti nessuna gara come questa

40 nuovi avvisi per Lavori di costruzione in Irlanda negli ultimi 7 giorni. Ricevi un'email quando escono nuovi avvisi. Gratis.

Crea il mio avviso

Scorciatoie da tastiera

Scorri un elenco senza toccare il mouse. Le scorciatoie restano inattive mentre scrivi in un campo.

j
Risultato successivo
k
Risultato precedente
Invio
Apri il risultato
n
Pagina successiva
p
Pagina precedente
c
Confronta questo risultato
s
Aggiungi questo risultato alla shortlist
/
Vai al campo di ricerca
?
Mostra queste scorciatoie
Esc
Chiudi