Vai al contenuto
Aperlena

A9(T) Tore Modelling

Aggiudicata Avviso di aggiudicazione Nessuna scadenza pubblicata
Segui questa gara

Le offerte sono chiuse. Un'aggiudicazione o una rettifica su questo avviso: un'email quando il registro lo vede. Accedi

  1. Aggiudicata
  2. Pubblicata

Descrizione

Transport Scotland previously commissioned a study under the DMRSS Framework to assess the safety and operational performance of the A9(T) corridor between North Kessock and Tore Roundabout, covering approximately 6km. This included both carriageways, North Kessock Junction, Tore Roundabout, and all intermediate junctions. The study reflected concerns raised by the DFM and her constituents and included extensive community engagement and options testing. The study took a holistic view of the corridor’s current performance and considered the influence of existing and future developments contributing traffic to this section of the A9. It identified several issues consistent with previous assessments and proposed a range of improvement options, including the signalisation of Tore Roundabout and potential closure or restriction of various intermediate junctions on the A9 between Tore and North Kessock. Following this, a VISSIM model was developed to evaluate the operational impact of signalising Tore Roundabout to improve active travel provision particularly to the local primary school. and the potential closure of Munlochy Junction. Building on the previous modelling work, the next phase aims to update or expand the analysis to assess: - The impact on the road network of signalising Tore Roundabout in the context of future development from the Black Isle and wider area. - The implications of closing Munlochy Junction, particularly for remaining right-turn movements across the A9 between Munlochy Junction and Tore Roundabout. - The potential implications at the junctions between Munlochy/ North Kessock and Tore itself. The updated study will evaluate: - Traffic flow along the A9(T) - Local access and connectivity for Tore residents - Broader network performance and journey times - The effects of local development on the A9, A835 and connecting local roads vis a vis the options for change on the A9 itself. Award against framework: Development Management, Road Safety and Active Travel Support Services Framework Community benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-procurement/ A summary of the expected community benefits has been provided as follows: Community benefits will be supplied inline with details outlined in the Schedule 5. (SC Ref:838639)

Fonte ufficiale

Fonte: Public Contracts Scotland

Verifica sempre i dettagli nell'avviso ufficiale.

Ultima verifica su Public Contracts Scotland 17 ore fa

Documenti su Public Contracts Scotland (inglese)

Altro da questo committente

Profilo completo del committente

Aggiudicazioni recenti

Gare simili

Contesto di mercato

Gara aperta media · Ambiente, fognature e pulizia
10.100.505 €
5.536 aperte ora in Europa
Storico della stazione appaltante su Aperlena
23 avvisi tracciati · 23 aggiudicati
39.361.223 € in contratti aggiudicati

Non perderti nessuna gara come questa

201 nuovi avvisi per Ambiente, fognature e pulizia in Regno Unito negli ultimi 7 giorni. Ricevi un'email quando escono nuovi avvisi. Gratis.

Crea il mio avviso

Scorciatoie da tastiera

Scorri un elenco senza toccare il mouse. Le scorciatoie restano inattive mentre scrivi in un campo.

j
Risultato successivo
k
Risultato precedente
Invio
Apri il risultato
n
Pagina successiva
p
Pagina precedente
c
Confronta questo risultato
s
Aggiungi questo risultato alla shortlist
/
Vai al campo di ricerca
?
Mostra queste scorciatoie
Esc
Chiudi