Aller au contenu
Aperlena

Provision of Planned Preventative Maintenance for Air Compressors at The Pirbright Institute

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Publié
  2. Attribué en attente

Description

Project Background The contract is for single supplier for the provision of Planned Preventative Maintenance (PPM) services for the Institute’s compressed air systems. 1.1 The proposed contract will: 1.2 Ensure statutory and regulatory compliance 1.3 Safeguard operational resilience across the estate 1.4 Deliver cost predictability through planned maintenance 1.5 Enhance asset lifecycle management and performance monitoring Scope of requirement The scope shall include, as a minimum: • Two service visits per compressor per annum (one minor and one major service unless otherwise specified) • Servicing in full compliance with original equipment manufacturer (OEM) requirements • Service dates agreed in advance between The Pirbright Institute Maintenance Scheduler and the Contractor’s nominated point of contact • Alignment of service delivery with the Institute’s planned building shutdown schedules, recognising that servicing may need to be phased rather than delivered in a single continuous visit • Assurance that compressed air supply remains operational at all times during servicing, achieved through the appropriate management of secondary/backup compressors and receivers • Provision of a dedicated engineer (or core engineering team), with a commitment to obtaining the necessary site security clearance to permit independent and unescorted working where authorised • Engineers suitably qualified and competent to sign off maintenance documentation before and after servicing, breakdown attendance, or additional works • Proactive notification to the Client where any of the following require repair or replacement: air ends, compressor auto drains, flexible pipework • Replacement of consumables within the defined service scope • Inspection of associated dryers, filtration systems, pipework, receivers, and safety devices • Digital service reporting provided at the point of service, detailing works undertaken, findings, recommendations, and asset condition • Emergency call-out provision with a target four-hour response time for critical assets Manufacturers in Scope The estate includes equipment manufactured by: • Atlas Copco • CompAir • Hydrovane • Busch Vacuum Solutions • Beko Technologies • HPC • Hi-Line • JORC 1.8 Compliance Requirements The Contractor must ensure compliance with: • Pressure Systems Safety Regulations 2000 • Health and Safety at Work etc. Act 1974 • Provision and Use of Work Equipment Regulations 1998 • Control of Substances Hazardous to Health Regulations 2002 The Contractor shall: • Provide RAMS for each visit • Maintain appropriate insurances • Ensure engineer competence and certification • Operate within site security protocols including accessing contained areas.

Source officielle

Source : Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Find a Tender Service (UK Cabinet Office / Crown Commercial Service) il y a 1 mois

Documents sur Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (anglais)

Plus de cet acheteur

Profil complet de l'acheteur

2 marchés ouverts actuellement

Attributions récentes

Marchés similaires

Contexte de marché

Historique de l'acheteur sur Aperlena
13 avis suivis · 6 attribués

Ne manquez plus aucun marché comme celui-ci

2 458 nouveaux avis pour tous les secteurs en Royaume-Uni au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer