Aller au contenu
Aperlena

Norway - Works for complete or part construction and civil engineering work - 1001386 Ramstadåsveien and others (Plant 1845)

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Publié
  2. Attribué en attente

Description

The project includes several pipeline stretches in the municipality. The project shall renovate the existing water pipelines mainly by blocking out, and new water pipelines/wastewater pipelines/AF pipelines/surface water pipelines shall be laid when excavating. Some pipeline stretches that go over private property shall be redeveloped. The project covers several pipeline stretches that must be renovated due to various reasons. The stretches are selected based on, among other things, rupture frequency, age and dimension. The existing pipeline installations are mainly from the years 1915-1930. New ditches shall be dug, new wastewater and surface water pipelines will also be laid. Some pipeline stretches that go over private property shall be redeveloped. This involves considerable excavation work inside private properties, as new service pipes must be laid up to the current drilling point. In some places this can be solved by pulling new service pipes into the water pipeline that is laid down. Most water manholes shall be replaced with prefabricated systems. In addition, if new water manholes replace the existing water manholes with a gutter system, a separate wastewater manhole is to be put down. When blocking out, pull with an overhead pipe to service pipes together with the new water pipeline. The main rule is that all service pipes shall be connected to the water manhole and there shall not be buried anchorages. Where, for various reasons, it is very far from the service line to the nearest water manhole, or it is difficult to lead the service pipes to water manholes, a double pipe can be drilled or set double-blown with a thread-free outlet on a pipeline. In such cases a simple service pipe foam is to be put without a bottom around the pipeline and the anchorage, so that the anchorage is available. Several service pipes can be carried to such a manhole. See PART 2 Contract documentation for detailed information on the project.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois

Plus de cet acheteur

Profil complet de l'acheteur

10 marchés ouverts actuellement

Attributions récentes

Marchés similaires

1

jour restant

Borggata nord partie 1

Norvège Travaux de construction Stord vatn og avløp as

Contexte de marché

Appel ouvert moyen · Travaux de construction
31 657 565 €
25 593 ouverts en Europe actuellement
Historique de l'acheteur sur Aperlena
78 avis suivis · 27 attribués
28 691 294 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

69 nouveaux avis pour Travaux de construction en Norvège au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer