TED - Tenders Electronic Daily (Publications Office of the EU)vérifié il y a 3 joursAvis de marché
1-BYM-2025 Exploitation et entretien du réseau routier dans le secteur Oslo Nord
OriginalNorway - Construction, foundation and surface works for highways, roads - 1-BYM-2025 Operation and maintenance of the road network in the Area Oslo North.
Ouvert
Norvège
Oslo og VikenTravaux de construction
1-BYM-2025 Exploitation et entretien du réseau routier dans le secteur Oslo Nord
Acheteur: Oslo Kommune Bymiljøetaten
Pays: Norvège
Valeur estimée: 10 155 565 €
Procédure: Procédure négociée
Secteur (CPV): Travaux de construction (45233000)
Aperlena: https://aperlena.com/fr/t/norway-construction-foundation-and-surface-works-for-highways-roads-1-bym-2025-operation-and-maintenance-of-the-ro-834ef5e590
Avis officiel: https://ted.europa.eu/en/notice/-/detail/684607-2025
Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit.
Se connecter
01
Résumé
Résumé généré automatiquement
La ville d'Oslo, par l'intermédiaire de l'Agence pour l'environnement urbain, lance un marché pour l'exploitation et l'entretien du réseau routier municipal, y compris le réseau routier départemental normé, dans le secteur nord d'Oslo. Le contrat couvre l'exploitation et l'entretien continus des routes, des chaussées, des pistes piétonnes et cyclables et des sentiers afin de garantir la sécurité routière, de préserver les investissements d'infrastructure antérieurs et de maintenir le standard du réseau routier, pour que tous les usagers circulent de manière sûre et efficace. La procédure est un appel d'offres avec négociation.
02
Description
Oslo municipality c/o the Agency for Urban Environment (henceforth referred to as the Contracting Authority) invites tenderers to a competition with negotiations for the procurement of a contract for the operation and maintenance of the road network in the area north of Oslo. The contracting authority is responsible for the municipal road network, including the normed county road network. The contracting authority is responsible for following up the requirements for noise and air pollution from roads given in the regulations of the Pollution Act. Furthermore, the Contracting Authority is responsible for long-term transport planning, traffic and street use plans, traffic safety and plans for accessibility measures for public transport as well as management and operation of municipal urban areas in Oslo. The urban space includes common areas such as roads and streets, squares and meeting places, parks and public recreation areas. The area of responsibility also includes municipal sports facilities and outdoor facilities, as well as municipal landscape rooms in the fields and inner Oslofjord. An important part of the management responsibility is connected to the procurement of services in the operation and maintenance of the road network in order to ensure good conditions for all road user groups. The aim of the procurement is to enter into a contract for the execution of operation and maintenance of roads to safeguard traffic safety and the infrastructure of previous investments and maintain the standard of the road network. The procurement shall ensure the provision of services and activities that are necessary out on the road network in order for traffic to arrive in a safe and efficient way. There is a continual need for operation and maintenance of roads, pavements, foot and cycle paths and foot paths within the entire municipality of Oslo. This procurement shall cover operation and maintenance in the area north of Oslo. The contract work includes, among other things, emptying sand traps, patching asphalt holes, cleaning and sweeping, snow clearing, removal of snow, gritting, emptying waste at stops, as well as cutting grass in central discounts. Minor maintenance work, such as replacing edge stones, repairing damaged or worn speed bumps and replacing damaged drains are a part of the contract work. Minor investment measures can also be included in the contract work. The works can, for example, be crossing tensioning, establishing new speed bumps, pruning along the pavement, upgrading/asphalting/maintaining stretches with footpaths and cycle paths. These work will, in such cases, be carried out as calculation works. The contract is not exclusive in regard to calculation works. For a more detailed description of the contract work and scope, see Annex 1 "Description of the Contract Work" and all annexes to the description. The stated estimated value is the average estimated annual contract value and it is based on historical figures from previous contracts. The actual extent of the assignments will vary. Subject to budget decisions and grants, as well as organisational changes. The amounts can be changed as regards budget adjustments during the contract period and changes to the contract work can occur during the contract period. The procurement shall contribute to making Oslo an active, green, safe and beautiful city for inhabitants and visitors. The negotiated procedure consists of two stages. The first step means that all interested suppliers can send a request to participate in the competition. The stated tender deadline on the time line is the estimated date. Qualified tenderers are invited to submit a tender in stage two. Tenderers who are invited to submit a tender will have access to the price form. The stated tender deadline is estimated. See the qualification and tender documentation for further information on the implementation of the competition.
Source officielle
Source : TED - Tenders Electronic Daily (Publications Office of the EU)
Vérifiez toujours les détails dans l'avis officiel.
Sur la base de 2 attributions avec un profil d'entreprise associé au cours des 5 dernières années.
05
Contexte de marché
Plus important que 79% des avis ouverts du secteur Travaux de construction en Europe.
les plus petitsles plus grands
ouverts en ce moment, Travaux de construction
28 913
avis ouvert médian
877 718 €
Qui remporte les marchés ici
Nombreux fournisseurs
Norvège · Travaux de construction
entreprises différentes ont remporté des attributions ici
235
des attributions sont allées aux trois titulaires les plus fréquents
9%
acheteurs ont attribué des marchés ici
105
D'après 337 attributions avec un titulaire nommé sur les 3 dernières années. Compté par attribution et non par montant, car les montants des lots et des accords-cadres ne sont pas comparables.
Concentré : les trois titulaires les plus fréquents ont obtenu 65% des attributions ou plus ; nombreux fournisseurs : moins de 35% avec au moins dix titulaires différents.
Concurrence
offres par lot en moyenne (procédures ouvertes et restreintes)
4,0
de ces lots ont reçu une seule offre
8%
des attributions sont allées à des entreprises établies dans un autre pays
1%
des offres venaient d'un autre pays
0%
Tels que les avis d'attribution officiels les indiquent, sur les 3 dernières années. Les offres par lot ne comptent que les procédures ouvertes et restreintes : dans une procédure négociée ou une attribution directe, une seule offre est la procédure elle-même. Le pays est celui que l'avis donne pour le titulaire.