Aller au contenu
Aperlena

New Hospital Programme - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract for Leighton Hospital

Attribué Avis d'attribution
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Attribué
  2. Date limite
  3. Publié

Description

NHS England (NHSE) has concluded a competitive dialogue procurement under the Public Contracts Regulations 2015 for the establishment of the Hospital 2.0 Alliance Framework ("H2A Framework") and the Hospital 2.0 Alliance Agreement. These two instruments form the basis of a multi-supplier integrated delivery model created to deliver the New Hospital Programme (NHP). The H2A Framework provides the mechanism for NHS Trusts to award Call-Off Contracts for schemes forming part of the New Hospital Programme using a Model Call-Off Contract. The Hospital 2.0 Alliance Agreement establishes the collaborative enterprise environment for NHSE, the Trusts, and the appointed H2A Contractors to foster alliance working and standardise design and delivery across the programme. Following completion of the collaborative allocation process in accordance with the terms of the H2A Framework as procured and awarded, Mid Cheshire Hospitals NHS Foundation Trust "the Trust" is now awarding the Call-Off Contract for Leighton Hospital, utilising the H2A Framework and the Model Call-Off Contract. The value of the Call-Off Contract given in this notice reflects the estimated value of the Scheme for all stages. The terms of the Call-Off Contract provide for the services and works to be performed in stages pursuant to the terms of the Model Call-Off Contract. Stage Zero Services comprise all the early constructability and advisory works to be completed in Stage Zero as set out in Scope S215 (Stage Zero Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage Zero, with an estimated value of £1815,718.20. Stage One Services comprise all the pre-construction works to be completed in Stage One as set out in Scope S200 (Stage One Services), and all other work, services and actions which the Call-Off Contract requires the Contractor to do during Stage One. Stage Two Works comprise all the remaining design and construction works forming part of the Scope to be carried out during Stage Two, including all tests, services and actions which the Call Off Contract requires the Contractor to do during Stage Two. Progression from Stage Zero to Stage One and from Stage One to Stage Two is conditional on the relevant Notice to Proceed, the Trust and New Hospital Programme's approvals/governance.

Source officielle

Source : Contracts Finder (UK Cabinet Office)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de Contracts Finder (UK Cabinet Office) il y a 1 mois

Documents sur Contracts Finder (UK Cabinet Office) (anglais)

Plus de cet acheteur

Profil complet de l'acheteur

Attributions récentes

Marchés similaires

1

jour restant

Travaux d'éclairage de secours à Porton

Royaume-Uni Travaux de construction Secretary of State for Health and Social Care acting as part...

970 032 €

valeur est.

Contexte de marché

Appel ouvert moyen · Travaux de construction
31 337 817 €
25 447 ouverts en Europe actuellement 93% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
4 avis suivis · 3 attribués
2 117 085 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

898 nouveaux avis pour Travaux de construction en Royaume-Uni au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer