Aller au contenu
Aperlena

Ireland - Research and development services and related consultancy services - Annual Total Cost of Development Study

Attribué Avis d'attribution Aucune date limite publiée
Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

  1. Attribué
  2. Publié

Description

The Annual Total Development Cost Study for 2026 will build on the 2025 Insights into Total Development Costs Study, and will be similarly formatted to the 2024 and 2025 reports. The 2026 study will provide comprehensive analysis of the total cost of residential development across various locations in Ireland, updated with Q1 2026 construction costs. It will focus on five regional areas provisionally: Dublin, Cork, Limerick, Galway and the North West, and five typologies (See methodology) based on the Standardised Design Approaches study. The study will perform a comparative assessment using urban and regional costs across the five selected locations, highlighting differences in land prices, service infrastructure, and labour availability in the regions. These insights will offer a regional view on the factors influencing development costs. The study will further refine its cost analysis findings by modelling alternative scenarios for financing, land acquisition and development firm models. By providing annual updates and a clear regional perspective, the study will establish a benchmark for residential development costs in Ireland that can contribute to policy and industry practices toward more affordable delivery of housing. Further to this, a detailed analysis will be included of materials and finishes, which will evaluate their impact on construction costs, while considering quality and durability. This assessment will compare traditional construction methods with modern methods of construction to identify cost efficiencies and potential savings. Part of this study is the evaluation of Modern Methods of Construction (MMC). The study will carry out a comparison of the cost of construction for one typical house and one apartment building in one location. The comparison will use a typical category 1 panelised system and a selected category 2 volumetric system for each building. The study will also identify the cost reduction opportunities available with bathroom pods. Any other significant cost reduction from standardised components should also be identified. The study will consider costs in regards to four different methods of construction for one house typology. The methods of timber in construction, insulated concrete formwork, light gauge steel and standard concrete must be used in the types of buildings analysed. The report should outline the benefits of using MMC with a specific focus on improving efficiency and increasing scale in the construction of these types of buildings. This study will perform an Economies of Scale Analysis, whereby it will carry out a comparison of the cost of delivery for the 3 Bed Semi D and an apartment when delivered by a Public Limited Company (PLC), a medium size builder and a small builder for one location such as the Greater Dublin Area. As an additional feature, this study will incorporate opportunity costs by examining the economic value of alternative uses of land, capital, labour, and time, including the impacts of delayed delivery and underutilised capital over longer construction periods. This study will also allow for the analysis of opportunity costs associated with Modern Methods of Construction (MMC) by adding a value to the build time and the reduction of time in terms of savings; it will analyse the effect of this on the overall cost and efficiency of housing delivery.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois

Plus de cet acheteur

Profil complet de l'acheteur

11 marchés ouverts actuellement

Attributions récentes

Historique des modifications

Chaque republication de cet avis par une source officielle avec un contenu différent. Nous surveillons toutes les sources que nous indexons, y compris les copies régionales du même avis.

  1. A lire avant de repondre
    • Valeur estimée: Fixé à 150 000 €
    • Date d'attribution: Attribué le 23 avril 2026
    • Valeur estimée: Fixé à 150 000 €

Suivez ce marche et nous vous ecrivons dès qu'il change. Créer un compte

Marchés similaires

Contexte de marché

Appel ouvert moyen · Recherche & développement
3 344 837 €
585 ouverts en Europe actuellement 96% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
469 avis suivis · 212 attribués
31 379 891 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

4 nouveaux avis pour Recherche & développement en Irlande au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer