Aller au contenu
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) vérifié il y a 9 heures Avis de marché

Ireland - Engineering works and construction works - DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road

Ouvert Irlande Eastern and Midland Travaux de construction

Acheteur public Dublin City Council

80,0 M € valeur estimée · 80 000 000 €

Informations clés

Publié
Concurrence
Course ouverte
  1. Publié

TED - Tenders Electronic Daily (Publications Office of the EU) ne publie pas de date limite pour cet avis. Voir l'avis officiel

Consulter l'avis officiel Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

Le Verdict Aperlena

Course ouverte

Aucun fournisseur ne domine : 38 entreprises différentes ont remporté les 61 derniers marchés comparables de cet acheteur en 5 ans. Une course réellement ouverte.

Prix final attendu par rapport à l'estimation publiée
0%
Délai attendu avant la décision d'attribution
155 jours
sur 26 attributions passées

Sur la base de 61 attributions comparables de cet acheteur dans ce secteur sur 5 ans. Chaque verdict est consigné avant le résultat et confronté à l'avis d'attribution. Comment nous nous notons.

Description

Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The overall value of the Framework is €80m ex. VAT. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531. Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The period of the Framework Agreement will be 4 years. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Signaler une erreur dans cet avis

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 9 heures

Ce que cet acheteur a paye jusqu'ici

Sur la base de 51 marches comparables attribues par cet acheteur dans ce secteur ces 4 dernieres annees.

Cet avis
80,0 M €
Montant median
544 000 €
Moitié centrale des attributions passées
224 841 € à 2,0 M €

L'estimation est supérieure à trois attributions passées sur quatre.

Attributions recentes

Montants attribues tels que publies par les sources officielles. A titre indicatif : le perimetre, les lots et la duree varient d'un marche a l'autre.

Dublin City Council

Irlande

avis dans le registre
795
attributions
643
attribués au total
429,1 M €

Un point par attribution, au jour de sa signature, à la taille de son montant. Un anneau est une attribution sans montant publié.

Qui remporte habituellement les marchés de cet acheteur dans ce secteur

Entreprise Attributions Montant total attribué Dernière attribution
Cairn Construction 7 2,0 M € mars 2026
Roadstone Ltd 6 14,3 M € oct. 2025
Citius Ltd 4 6,0 M € sept. 2026
Richard Nolan Civil Engineering LTD 4 1,7 M € août 2024
SIAC Bituminous Products Ltd 3 4,0 M € avr. 2026

Sur la base de 61 attributions avec un profil d'entreprise associé au cours des 5 dernières années.

43 marchés ouverts actuellement

Contexte de marché

Plus important que 95% des avis ouverts du secteur Travaux de construction en Europe.

ouverts en ce moment, Travaux de construction
28 946
avis ouvert médian
809 268 €

Marchés similaires

Ouverts en ce moment

3

jours restants

Passerelle N59 Oughterard

Irlande Travaux de construction Galway County Council

22 000 000 €

valeur est.

Déjà attribués

Ne manquez plus aucun marché comme celui-ci

867 nouveaux avis pour Travaux de construction en Irlande au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
o
Ouvrir le résultat dans un nouvel onglet
x
Écarter ce résultat
/
Rechercher depuis n’importe quelle page
Ctrl K
Rechercher depuis n’importe quelle page
?
Afficher ces raccourcis
Échap
Fermer

Sommaire

Fermer
Se connecter

Langue