Résumé généré automatiquement

Le Kerry County Council, avec le soutien de Transport Infrastructure Ireland, acquiert un contrat de conception et de construction pour des parties du South Kerry Greenway, un itineraire de 27 km entre Glenbeigh et Cahersiveen, dans le comte de Kerry en Irlande. L'appel d'offres couvre les sections 2A et 2C, l'ouvrage franchissant la N70 et le parking de Kells, incluant la conception, la gestion environnementale, les terrassements, le drainage, la chaussee, les clotures, le paysagisme, les ouvrages d'art et travaux connexes. Des tunnels historiques sont dans le perimetre, tandis que le pont de Cahersiveen, le viaduc de Gleensk et le passage souterrain de la N70 sont exclus. Des conditions environnementales et d'urbanisme strictes s'appliquent, la route traversant ou longeant des zones SAC et SPA. Aucune valeur estimee, date limite ni procedure ne sont indiquees dans l'avis.

Description

Kerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of a 27 km greenway between Glenbeigh and Cahersiveen Co. Kerry. The route has been split up into several construction packages with Kerry County Council undertaking the construction of some of the works under direct labour. This tender competition covers the Design and Build elements of the scheme only, which includes Greenway Section 2A (Ch 18,150 to Ch 21,231), Greenway Section 2C (Ch 22,145 to Ch 25,678), N70 Overbridge (CH 26,870) and Kells Car Park (CH 18,150). The works requirements for the above sections will encompass all works necessary to complete the greenway including, design, PSDP Services, PSCS Services, environmental management, earthworks, drainage, pavement, fencing, landscaping, signage, slope stabilization, retaining wall construction, rehabilitation of existing structures, construction of new structures, road realignment, traffic management and all other services necessary to complete the works. The Design and Build Section contains a number of tunnels of historical and cultural significance. Please note the Cahersiveen (Valentia Estuary) Bridge, the Gleensk Viaduct and the N70 Underpass are not included in the scope of this Design and Build competition. It is a requirement that all the conditions imposed by the Planning Consent, the Environmental Impact Assessment Report, the associated Schedule of Environmental Commitments, and the Natura Impact Statement, and any Wildlife and Derogation Licences are complied with in full. The greenway route traverses or is in close proximity to several Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The project is subject to strict environmental controls in accordance with the plans, particulars and conditions associated with the project consents. Environmental management will form a key part of the successful execution of this project. In particular, it is a requirement that construction is carried out in accordance with the Construction Environmental Management Plan (CEMP), other environmental management plans required under the EIAR and NIS, relevant Wildlife and derogation licences to create and manage a suitable receiving environment for the Kerry Slug in the area affected by the proposed greenway. A series of advance works contracts have been completed. These include the construction of a Gabion Trial Section at Mountain Stage and Site Clearance and Temporary Fencing. Candidates that are pre-qualified and shortlisted on the basis of their responses to this first stage Pre-Qualification may be invited to participate in the second stage Tender. That tender competition will be awarded on the basis of the Most Economically Advantageous Tender based on Award Criteria made up of 70 (Quality) and 30 (Price).

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois

Plus de cet acheteur

Profil complet de l'acheteur

Qui remporte habituellement les marchés de cet acheteur dans ce secteur

Entreprise Attributions Montant total attribué Dernière attribution
Sorensen Civil Engineering Ltd 1 €10,0M août 2026
TRIUR Construction Limited 1 238 118 € août 2026

Sur la base de 2 attributions avec un profil d'entreprise associé au cours des 5 dernières années.

Historique des modifications

Chaque republication de cet avis par une source officielle avec un contenu différent. Nous surveillons toutes les sources que nous indexons, y compris les copies régionales du même avis.

  1. A lire avant de repondre
    • Valeur estimée: Fixé à 24 000 000 €
    • Valeur estimée: Fixé à 24 000 000 €

Suivez ce marche et nous vous ecrivons dès qu'il change. Créer un compte

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
33 193 450 €
31 089 ouverts en Europe actuellement 28% en dessous de la moyenne du secteur
Historique de l'acheteur sur Aperlena
20 avis suivis · 6 attribués
11 132 075 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

40 nouveaux avis pour Travaux de construction en Irlande au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer