Irlande - Construction d'abris de bus - Conception et construction du depot de bus de Ballycoolin

Original Ireland - Bus-stop shelter construction work - Ballycoolin Bus Depot Design and Build

Ouvert Avis de marché Aucune date limite publiée
Suivre ce marché

Nous vous écrivons si la date limite change ou si un rectificatif est publié. Gratuit. Se connecter

Résumé

Résumé généré automatiquement

La National Transport Authority (NTA) irlandaise achete un contrat de conception et construction pour le depot de bus de Ballycoolin, a l'ouest de Dublin. AECOM agit comme representant du maitre d'ouvrage et conseiller technique. Le depot fait partie de BusConnects Dublin et soutient l'electrification de la flotte. Il comprendra une capacite d'environ 180 bus (conception actuelle : 176), des installations de maintenance et de recharge pour bus electriques, des bureaux administratifs d'environ 2.520 metres carres, un batiment de lavage et nettoyage de vehicules d'environ 1.120 metres carres, ainsi que des ateliers de reparation et de maintenance. Aucune valeur estimee ni date limite n'est indiquee dans l'avis. Procedure : achat en conception et construction par la NTA.

Description

To assist the NTA in the delivery of its Bus depot programme, it has been agreed that the Ballycoolin Bus Depot Project Design and Build Contract (the Project) will be procured by the National Transport Authority with AECOM acting as Employer's Representative and technical advisor to the NTA. BusConnects Dublin is a central component of the NTA Transport Strategy for the Greater Dublin Area which will reshape the city's public transportation landscape. Aligned with the Government's agenda to decarbonise the economy, the focus on electrifying the transport network is central to this strategy. This vision includes a substantial increase in the number of electrified buses within the fleet to facilitate expanded routes and heightened service frequencies. However, the current depot network in Dublin West is constrained and unable to accommodate these additional buses. As demand increases, expectations for continued growth and service reconfigurations place further pressure on the existing bus depot network, particularly as suburban population growth accelerates. The Ballycoolin depot will support this expansion by providing dedicated facilities for EV maintenance and charging while also providing onsite accommodation for operational and administrative staff. This integrated approach not only strengthens Dublin's public transport infrastructure but also supports sustainability objectives and the electrification of the transport system. Project Summary The Ballycoolin Bus Depot is a facility for electric buses and includes a comprehensive range of features designed to optimise public transport service delivery. The depot will accommodate: -Capacity for approximately 180 buses, with the current design accommodating 176 buses. -Administrative offices including an atrium entrance with a total floor area of approximately 2,520 square metres. -vehicle washing and cleaning building of approximately 1,120 square metres. -Major and minor repairs and maintenance bays, workshops and stores with a combined floor area of approximately 2,680 square metres. -Gate, entrance and security facilities.20 21Vehicle inspection bays and associated facilities with a floor area of approximately 510 square metres. -An electrical substation compound of approximately 2,700 square metres. -Seven transformer buildings of approximately 60 square metres each. -Car parking facilities including approximately 57 standard parking spaces, three accessible spaces, six motorcycle spaces and six electric vehicle spaces, with a total area of approximately 1,700 square metres. -Cycle parking facilities of approximately 24 square metres. -All associated ancillary works required for the delivery and operation of the facility.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 1 mois

Plus de cet acheteur

Profil complet de l'acheteur

17 marchés ouverts actuellement

Cet acheteur n'a encore aucune attribution enregistrée dans ce secteur. Attributaires habituels, Travaux de construction - Irlande

Entreprise Attributions Montant total attribué Dernière attribution
TRIUR Construction Limited 20 €107,4M août 2026
Roadstone Ltd 12 €12,8M sept. 2026
Carra Plant Hire Ltd 12 €1,7M sept. 2026
Jons Civil Engineering Company Limited 9 €45,3M août 2026
Donnelly Civil Engineering Ltd 8 €8,5M juil. 2026

Sur la base de 897 attributions avec un profil d'entreprise associé au cours des 2 dernières années.

Historique des modifications

Chaque republication de cet avis par une source officielle avec un contenu différent. Nous surveillons toutes les sources que nous indexons, y compris les copies régionales du même avis.

  1. A lire avant de repondre
    • Valeur estimée: Fixé à 80 000 000 €
    • Valeur estimée: Fixé à 80 000 000 €

Suivez ce marche et nous vous ecrivons dès qu'il change. Créer un compte

Marchés similaires

Contexte de marché

Appel ouvert moyen · Travaux de construction
33 227 159 €
31 306 ouverts en Europe actuellement 141% au-dessus de la moyenne du secteur
Historique de l'acheteur sur Aperlena
59 avis suivis · 21 attribués
74 092 987 € de contrats attribués

Ne manquez plus aucun marché comme celui-ci

35 nouveaux avis pour Travaux de construction en Irlande au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
/
Aller au champ de recherche
?
Afficher ces raccourcis
Échap
Fermer