Aller au contenu
Aperlena

TED - Tenders Electronic Daily (Publications Office of the EU) vérifié il y a 20 heures Avis de marché

Denmark - Construction work - North Sea I, Mid, Offshore Wind Farm

Clôturé Danemark Midtjylland Travaux de construction

Acheteur public Danish Energy Agency

2,1 Md € valeur estimée · 2 100 727 896 € · converti depuis DKK

Informations clés

Clôturé
14:00 (UTC+2)
Procédure
Procédure ouverte
  1. Publié
  2. Date limite ouvert 181 jours
  3. Attribué en attente
Consulter l'avis officiel Suivre ce marché

Les offres sont closes. Une attribution ou un rectificatif sur cet avis : un e-mail quand le registre le voit. Se connecter

Description

The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named North Sea I, Mid, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 1 GW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of North Sea I, Mid Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 15.7 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. Reference is made to the Annex F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference) for an overall description of the principles in capability-based two-way CfD scheme. The scheme constitutes State aid within the meaning of Article 107(1) of the Treaty on the Functioning of the European Union (TFEU). Please note that the name of the offshore wind farm can be changed by the Danish Energy Agency (“DEA”). Such change will not affect the geographical location of the offshore wind farm. The North Sea I, Mid will in the following be called “the Offshore Wind Farm”. The minimum capacity of the Offshore Wind Farm shall be established no later than 31 December 2032. The concessionaire will in special cases be entitled to an extension of this deadline. Connection of the Offshore Wind Farm to the Danish transmission grid is voluntary for the concessionaire. The Concession Agreement further enables the Concessionaire to establish overplanting capacity in excess of the required minimum capacity within the concession area, i.e. it is optional for Concessionaire to establish more than 1 GW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the Offshore Wind Farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation. With the sole exception of the capability-based two-way CfD scheme, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the Offshore Wind Farm, including any potential overplanting capacity. Such commercial risks include but is not limited to, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall bear the costs as stipulated in the construction permit and/or procurement material. Please note that contrary to earlier procurements rounds concerning offshore wind the Concessionaire shall not bear the actual cost of the temporary and permanent preventive measures, which by decision of the Danish Defence must be implemented by the Concessionaire to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the Offshore Wind Farm. Such costs will be borne by the Danish Defence. Furthermore, contrary to earlier procurements rounds for offshore wind, the Concessionaire shall not pay the cost of the offshore preliminary investigations performed by Energinet, cf. section 23 (3) of the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Such costs will be borne by the Danish State. The location site of the Offshore Wind Farm is further stated below under section "Place of Performance" as well as in the procurement material Appendix 2 (Location of the Concession Area). Reference is further made to the regulation in the Procurement Specifications, Annex F (Concession Agreement), Appendix 1 (Project Specification), and the procurement material as a whole.

Source officielle

Source : TED - Tenders Electronic Daily (Publications Office of the EU)

Vérifiez toujours les détails dans l'avis officiel.

Signaler une erreur dans cet avis

Dernière vérification auprès de TED - Tenders Electronic Daily (Publications Office of the EU) il y a 20 heures

Danish Energy Agency

Danemark

avis dans le registre
6
attributions
3

1 marché ouvert actuellement

Contexte de marché

ouverts en ce moment, Travaux de construction
28 967
avis ouvert médian
806 452 €

Marchés similaires

Ouverts en ce moment

Déjà attribués

Ne manquez plus aucun marché comme celui-ci

561 nouveaux avis pour Travaux de construction en Danemark au cours des 7 derniers jours. Recevez un e-mail quand de nouveaux avis paraissent. Gratuit.

Créer mon alerte

Raccourcis clavier

Parcourir une liste sans toucher la souris. Les raccourcis restent inactifs pendant la saisie dans un champ.

j
Résultat suivant
k
Résultat précédent
Entrée
Ouvrir le résultat
n
Page suivante
p
Page précédente
c
Comparer ce résultat
s
Ajouter ce résultat à la présélection
o
Ouvrir le résultat dans un nouvel onglet
x
Écarter ce résultat
/
Rechercher depuis n’importe quelle page
Ctrl K
Rechercher depuis n’importe quelle page
?
Afficher ces raccourcis
Échap
Fermer

Sommaire

Fermer
Se connecter

Langue