Los anuncios de este tipo (Reino Unido, procedimiento abierto) dan una mediana de 30 días, la mitad entre 24 y 34 días, según 539 anuncios de los dos últimos años.
Swanley Park Footpath Refurbishment
Órgano de contratación: Swanley Town Council
País: Reino Unido
Plazo: 30 nov. 2026, 12:00 (UTC)
Valor estimado: 23.752 €
Procedimiento: Procedimiento abierto
Sector (CPV): Trabajos de construcción (45233161)
Aperlena: https://aperlena.com/es/t/swanley-park-footpath-refurbishment-9de23f381c
Anuncio oficial: https://www.contractsfinder.service.gov.uk/Notice/c5220f56-6af4-449e-ac5f-ec2993bbe258
Si cambia el plazo o se corrige el anuncio, te escribimos.
Iniciar sesión
01
Descripción
Swanley Town Council is seeking suitably qualified and experienced contractors to undertake the excavation, removal, reconstruction and improvement of two existing footpaths. The project aims to improve accessibility, durability and the overall quality of the footpath network through the installation of wider, fit-for-purpose pathways that meet the requirements of their intended use.
The works will comprise the following:
Footpath One
Footpath One extends approximately 355.4 linear metres and will broadly follow the alignment of the existing footpath. The pathway will be widened to provide a finished width of approximately 2.5 metres, excluding edging. The construction must be suitable for occasional vehicular access, with the appropriate sub-base and construction specification provided to accommodate this requirement.
Footpath Two
Footpath Two currently measures approximately 29 linear metres and will be extended to approximately 62.3 linear metres. The completed pathway will provide a finished width of approximately 2 metres, excluding edging, improving the provision and usability of the route.
Surfacing Options and Construction Requirements
The Council is currently exploring a range of surfacing options for the proposed footpaths, including self-binding gravel, tarmac and block paving. Contractors may be required to consider the suitability, durability, maintenance requirements, accessibility and whole-life costs associated with these options to help inform the Council's final decision on the preferred surfacing materials.
The appointed contractor will be expected to undertake the necessary excavation and removal of existing footpath materials, prepare the underlying formation, install an appropriate sub-base and construct the new footpaths in accordance with the agreed specification. The works will also include suitable edging, finishing details and any associated reinstatement required to leave the completed pathways in a safe, stable and serviceable condition.
All works must be carried out to an appropriate professional standard, with due consideration given to site conditions, public safety, drainage, accessibility and the long-term performance of the finished surfaces. The contractor will be responsible for ensuring that the construction methods and materials used are suitable for the intended use of each footpath.
The Council is seeking a cost-effective and durable solution that provides improved pedestrian routes, meets the operational requirements of the site and offers good long-term value for money.
Arrange for a site visit if required by contacting (George) gbrooker@swanleytowncouncil.gov.uk
Apply by sending your quote to (Ryan) rhayman@swanleytowncouncil.gov.uk
02
¿Licitamos o no?
Seis preguntas antes de comprometer a un equipo. Debajo de cada una, lo que el registro sabe de ella. Las respuestas son tuyas.
¿Puedo presentarme?
Procedimiento abierto: cualquier proveedor interesado puede presentar oferta.
Documentos en inglés.
Fuente oficial
Fuente: Contracts Finder (UK Cabinet Office)
Verifica siempre los detalles en el anuncio oficial.
El comprador tiene muy pocas adjudicaciones propias en este sector, así que este es el rango de las últimas 1.301 adjudicaciones de Trabajos de construcción en Reino Unido.
1 €979,4 M €
Este anuncio
23.752 €
Importe mediano
291.869 €
Mitad central de las adjudicaciones anteriores
99.168 € a 1,1 M €
La estimación es menor que tres de cada cuatro adjudicaciones anteriores.
Importes de adjudicacion segun los publican las fuentes oficiales. Uselos como guia, no como regla: el alcance, los lotes y la duracion varian entre contratos.
A partir de 1529 adjudicaciones con perfil de empresa vinculado en los últimos 2 años.
05
Contexto de mercado
Mayor que el 4% de los anuncios abiertos de Trabajos de construcción en Europa.
los más pequeñoslos más grandes
abiertos ahora en Trabajos de construcción
19.868
anuncio abierto mediano
600.000 €
Quién gana en este mercado
Muchos proveedores
Reino Unido · Trabajos de construcción
empresas distintas ganaron adjudicaciones aquí
847
de las adjudicaciones fueron a los tres adjudicatarios más frecuentes
6%
compradores adjudicaron contratos aquí
392
Según 1.523 adjudicaciones con adjudicatario identificado en los últimos 3 años. Contadas por adjudicación y no por importe, porque los importes de lotes y acuerdos marco no son comparables.
Concentrado: los tres adjudicatarios más frecuentes obtuvieron el 65% de las adjudicaciones o más; muchos proveedores: menos del 35% con al menos diez adjudicatarios distintos.