Saltar al contenido
Aperlena

Moveable Shielding Concept Design Study

Abierta Anuncio de licitación Quedan 17 días
Vigilar esta licitación

Te escribimos si cambia el plazo o se publica una corrección. Gratis. Iniciar sesión

  1. Publicada
  2. Hoy
  3. Fecha límite abierta 24 días
  4. Adjudicada

Descripción

UKFE is seeking to appoint a supplier to provide a Concept Design Study for a Moveable Shielding requirement, as part of the STEP Prototype Power Plant. UKFE is leading the delivery of the STEP programme to design and build the UK’s first prototype fusion energy plant at West Burton, Nottinghamshire. Please see the Tender Pack, available on the UKFE Delta Portal, for further details on this requirement, the rules of the procurement, and how to bid. For more information about this opportunity, please visit the eSourcing portal at: https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-services./2VD655382C To respond to this opportunity, please click here: https://ukfe.delta-esourcing.com/respond/2VD655382C

Fuente oficial

Fuente: Find a Tender Service (UK Cabinet Office / Crown Commercial Service)

Verifica siempre los detalles en el anuncio oficial.

Última verificación con Find a Tender Service (UK Cabinet Office / Crown Commercial Service) hace 6 días

Documentos en Find a Tender Service (UK Cabinet Office / Crown Commercial Service) (inglés)

Más de este comprador

Perfil completo del comprador

2 licitaciones abiertas ahora mismo

Adjudicaciones recientes

Licitaciones similares

Contexto de mercado

Licitación abierta media · Servicios de arquitectura e ingeniería
9.122.521 €
14.955 abiertas ahora en Europa 99% por debajo de la media del sector
Historial del comprador en Aperlena
19 anuncios registrados · 13 adjudicados

No te pierdas ninguna licitación como esta

Recibe un email con las nuevas licitaciones de: Servicios de arquitectura e ingeniería · Reino Unido. Gratis.

Crear mi alerta

17 días restantes

Fuente