Germania - Servizi finanziari e assicurativi - Assicurazione combinata tutti rischi marittimi e costruzioni e assicurazione di responsabilità civile per i collegamenti alla rete HV/DC North Sea Connector 1 e 2
OriginaleDeutschland - Finanz- und Versicherungsdienstleistungen - Project related Combined Marine- and Construction Allrisk Insurance (Primary Policy) and Third Party Liability Insurance (Primary Policy and related excess layer policies) for HV/DC Grid Connection Systems North Sea Connector 1 and North Sea Connector 2 located in the German North Sea and German northern mainland
Ti scriviamo se cambia la scadenza o esce una rettifica. Gratis.Accedi
Germania - Servizi finanziari e assicurativi - Assicurazione combinata tutti rischi marittimi e costruzioni e assicurazione di responsabilità civile per i collegamenti alla rete HV/DC North Sea Connector 1 e 2
Stazione appaltante: 50Hertz Offshore GmbH
Paese: Germania
Valore stimato: 82.000.000 €
Procedura: Procedura negoziata
Settore (CPV): Servizi finanziari e assicurativi (66000000)
Aperlena: https://aperlena.com/it/t/deutschland-finanz-und-versicherungsdienstleistungen-project-related-combined-marine-and-construction-allrisk-insu-5c4bd1fcf4
Avviso ufficiale: https://ted.europa.eu/en/notice/-/detail/643023-2026
Sintesi
Sintesi generata automaticamente
Questa gara tedesca riguarda polizze assicurative di progetto per due sistemi di collegamento alla rete HV/DC, North Sea Connector 1 e North Sea Connector 2, situati nel Mare del Nord tedesco e sulla terraferma nel nord della Germania. La copertura è suddivisa in cinque lotti: Lotto 1, un'assicurazione combinata tutti rischi marittima e costruzioni come polizza primaria; Lotto 2, responsabilità civile inclusa la responsabilità ambientale e il danno ambientale per i sottoprogetti LanWin 3 e LanWin 6; Lotto 3, responsabilità civile più responsabilità professionale per i sottoprogetti DC 31 e DC 32; Lotto 4, la stessa copertura come primo strato eccedente; e Lotto 5, responsabilità civile con coperture ambientali come secondo strato eccedente. Ciascun sistema comprende un convertitore offshore, cavi in corrente continua da 525 kV e 2 GW offshore e onshore, e una stazione convertitrice onshore.
Descrizione
Project Insurance Policies for HV/DC Grid Connection Systems North Sea Connector 1 and North Sea Connector 2 The tendered Insurance Coverage is subdivided in 5 lots, such as: Lot 1: Combined Marine and Construction Allrisk Insurance for HV/DC Grid Connection Systems North Sea Connector 1 and North Sea Connector 2 (Primary Policy) Lot 2: Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover for HV/DC Grid Connection Systems North Sea Connector 1 (just subproject LanWin 3) and North Sea Connector 2 (just subproject LanWin 6) (both Primary Policies) Lot 3: Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover and Professional Indemnity Insurance for HV/DC Grid Connection Systems North Sea Connector 1 (just subproject DC 31) and North Sea Connector 2 (just subproject DC 32) (both Primary Policies) Lot 4: Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover and Professional Indemnity Insurance for HV/DC Grid Connection Systems North Sea Connector 1 (just subproject DC 31) and North Sea Connector 2 (just subproject DC 32) (first Excess Layer) Lot 5: Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover for HV/DC Grid Connection Systems North Sea Connector 1 (just subproject DC 31) and North Sea Connector 2 (just subproject DC 32) (second Excess Layer)
Procurement of Combined Marine and Construction Allrisk Insurance for HV/DC Grid Connection Systems North Sea Connector 1 and North Sea Connector 2 The Grid Connection systems (North Sea Connector 1 and North Sea Connector 2) each consisting of Offshore Converter incl. auxiliary equipment, 525kV 2 GW DC offshore cable systems to DC Converter Onshore at Nordhub / Heidehub on German mainland, 525kV 2 GW DC onshore cable systems from KAS to Onshore Converter and onshore Converter Station incl. auxiliary equipment. The Onshore Converters at Nordhub / Heidehub and 525kV 2 GW DC onshore cable systems from Nordhub / Heidehub to KAS (cable section station) are not part of this tender. These assets are part of TenneT’s project share and will be insured by them. Insured Interest: ‘All Risks’ of physical loss or physical damage in respect of the North Sea Connector 1 and North Sea Connector 2 projects plus removal of Wreck, Debris and Sue & Labour and other coverage as per wording. Insurance policy wording will grant seamless transition from Marine- to Construction Allrisk Insurance. Inception of insurance cover will be with start of first construction works estimated in Q2 2027. The insurance period will end with final taking-over of the whole project estimated in 2033, followed by 24 months of Extended Maintenance. Key facts of tendered Coverage: Combined Marine and Construction Allrisk Insurance for HV/DC Grid Connection Systems North Sea Connector 1 and North Sea Connector 2 with a total insurable value of approx. 9,8 billion EUR (Primary Policy). For North Sea Connector 1 and North Sea Connector 2, separate policies are required with Single Loss Limit 800,000,000 EUR for each project (not cumulative).; Project related Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover including all deliverables and works of insured contractors. Works related to these projects will be performed onshore as well as offshore. This insurance will grant coverage for legal liability and - as far as explicit included - contractual liability - of co-insured contractors, subcontractors including joint-ventures working on this project, - of experts, architects, engineers, project manager (project developer, project controller) as well as specialist experts and safety coordinators, involved in the project, - freelancer with regard to claims, which will be incurred by performing works in the interest of the Principal Insured. With regard to co-insured contractors and their respective subcontractors is agreed that their own insurances will be primary to this insurance - this insurance will be valid after a deductible of 25,000,000 EUR. Keyfacts of tendered Coverage: Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover for HV/ DC Grid Connection subprojects LanWin 3 (part of Offshore Grid Connection System North Sea Connector 1) and LanWin 6 (part of Offshore Grid Connection System North Sea Connector 2) Limit of Liability: 50,000,000 EUR per occurrence and in the aggregate. For LanWin 3 (North Sea Connector 1) and LanWin 6 (North Sea Connector 2) separate policies are required with Limit of liability 50,000,000 EUR for each project applicable.; Project related Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover and Professional Indemnity including all deliverables and works of insured contractors. Works related to these projects will be performed onshore. This insurance will grant coverage for legal liability and - as far as explicit included - contractual liability - of co-insured contractors, subcontractors including joint-ventures working on this project, - of experts, architects, engineers, project manager (project developer, project controller) as well as specialist experts and safety coordinators, involved in the project, - freelancer regarding claims, which will be incurred by performing works in the interest of the Principal Insured. Keyfacts of tendered Coverage: Third Party Liability Cover including Environmental Liability Cover, Environmental Impairment Cover and Professional Indemnity for HV/ DC Grid Connection subprojects DC31 (part of Offshore Grid Connection System North Sea Connector 1) and DC32 (part of Offshore Grid Connection System North Sea Connector 2). Limit of Liability: Bodily injury and property damage including consequential losses arising there of: 25,000,000 EUR per occurrence and three times in the aggregate. Professional Indemnity: 10,000,000 EUR per occurrence and three times in the aggregate. For DC31 (North Sea Connector 1) and DC32 (North Sea Connector 2) separate policies are required with Limit of liability 25,000,000 EUR / 10,000,000 EUR (as described above) for each project applicable.; Project related Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover and Professional Indemnity including all deliverables and works of insured contractors. Works related to these projects will be performed onshore. This insurance will grant coverage for legal liability and - as far as explicit included - contractual liability - of co-insured contractors, subcontractors including joint-ventures working on this project, - of experts, architects, engineers, project manager (project developer, project controller) as well as specialist experts and safety coordinators, involved in the project, - freelancer with regard to claims, which will be incurred by performing works in the interest of the Principal Insured. Keyfacts of tendered Coverage: Third Party Liability Cover including Environmental Liability Cover, Environmental Impairment Cover and Professional Indemnity for HV/ DC Grid Connection subprojects DC31 (part of Offshore Grid Connection System North Sea Connector 1) and DC32 (part of Offshore Grid Connection System North Sea Connector 2) Limit of Liability: Bodily injury and property damage including consequential losses arising there of: 25,000,000 EUR per occurrence and three times in the aggregate. In excess of underlying primary cover with limit of 25,000,000 EUR per occurrence and three times in the aggregate. Professional Indemnity: 10,000,000 EUR per occurrence and three times in the aggregate In excess of underlying primary cover with limit of 10,000,000 EUR per occurrence and three times in the aggregate. For DC31 (North Sea Connector 1) and DC32 (North Sea Connector 2) separate policies are required with Limit of liability 25,000,000 EUR / 10,000,000 EUR (as described above) for each project applicable.; Project related Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover including all deliverables and works of insured contractors. Works related to these projects will be performed onshore. This insurance will grant coverage for legal liability and - as far as explicit included - contractual liability - of co-insured contractors, subcontractors including joint-ventures working on this project, - of experts, architects, engineers, project manager (project developer, project controller) as well as specialist experts and safety coordinators, involved in the project, - freelancer regarding claims, which will be incurred by performing works in the interest of the Principal Insured. Keyfacts of tendered Coverage: Third Party Liability Cover including Environmental Liability Cover and Environmental Impairment Cover for HV/ DC Grid Connection subprojects DC31 (part of Offshore Grid Connection System North Sea Connector 1) and DC32 (part of Offshore Grid Connection System North Sea Connector 2) Limit of Liability: Bodily injury and property damage including consequential losses arising there of: 50,000,000 EUR per occurrence and two times in the aggregate. In excess of underlying primary cover and first excess layer with total limit of 50,000,000 EUR per occurrence and three times in the aggregate. For DC31 (North Sea Connector 1) and DC32 (North Sea Connector 2) separate policies are required with limit of liability 50,000,000 EUR (as described above) for each project applicable.
Fonte ufficiale
Fonte: TED - Tenders Electronic Daily (Publications Office of the EU)
Verifica sempre i dettagli nell'avviso ufficiale.
Ultima verifica su TED - Tenders Electronic Daily (Publications Office of the EU) 1 giorno fa