TED - Tenders Electronic Daily (Publications Office of the EU) verificato 14 ore fa Bando di gara

Parco eolico offshore North Sea I, Sud, Danimarca

Originale Denmark - Construction work - North Sea I, South, Offshore Wind Farm

Aperta Danimarca Midtjylland Lavori di costruzione

Stazione appaltante Danish Energy Agency

752 giorni rimasti

Dati principali

Chiude
14:00 (UTC+2)
Importo stimato
883,1 Mln €
883.108.542 € · convertito da DKK
Procedura
Procedura aperta
  1. Pubblicata
  2. Oggi
  3. Scadenza aperta 1.068 giorni
  4. Aggiudicata in attesa
Vedi l'avviso ufficiale Segui questa gara

Se la scadenza cambia o il bando viene rettificato, ti scriviamo. Accedi

Sintesi

Sintesi generata automaticamente

L'acquirente danese bandisce un appalto per la realizzazione di un nuovo grande parco eolico offshore denominato North Sea I, Sud. Al concessionario viene conferito il diritto e l'obbligo di utilizzare l'area di concessione per costruire ed esercitare un parco eolico offshore con una capacità minima di 1 GW, per produrre e distribuire elettricità a proprio rischio e spese. Il concessionario riceverà un sostegno economico per l'elettricità prodotta dalla capacità minima attraverso un contratto per differenza bidirezionale della durata di 20 anni. In base a tale schema, il concessionario deve effettuare pagamenti allo Stato danese nei mesi in cui il prezzo di esercizio, pari al prezzo dell'offerta del concorrente aggiudicatario, risulta inferiore al prezzo di riferimento calcolato. La procedura applicabile è la procedura aperta ai sensi della legge danese sugli appalti pubblici.

Descrizione

The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named North Sea I, South, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 1 GW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of North Sea I, South Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 6.6 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. Reference is made to the Annex F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference) for an overall description of the principles in capability-based two-way CfD scheme. The scheme constitutes State aid within the meaning of Article 107(1) of the Treaty on the Functioning of the European Union (TFEU). Please note that the name of the offshore wind farm can be changed by the Danish Energy Agency (“DEA”). Such change will not affect the geographical location of the offshore wind farm. The North Sea I, South will in the following be called “the Offshore Wind Farm”. The minimum capacity of the Offshore Wind Farm shall be established no later 31 December 2034. The concessionaire will in special cases be entitled to an extension of this deadline. Connection of the Offshore Wind Farm to the Danish transmission grid is voluntary for the concessionaire. The Concession Agreement further enables the Concessionaire to establish overplanting capacity in excess of the required minimum capacity within the concession area, i.e. it is optional for Concessionaire to establish more than 1 GW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the Offshore Wind Farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation. With the sole exception of the capability-based two-way CfD scheme, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the Offshore Wind Farm, including any potential overplanting capacity. Such commercial risks include but is not limited to, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall bear the costs as stipulated in the construction permit and/or procurement material. Please note that contrary to earlier procurements rounds concerning offshore wind the Concessionaire shall not bear the actual cost of the temporary and permanent preventive measures, which by decision of the Danish Defence must be implemented by the Concessionaire to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the Offshore Wind Farm. Such costs will be borne by the Danish Defence. Furthermore, contrary to earlier procurements rounds for offshore wind, the Concessionaire shall not pay the cost of the offshore preliminary investigations performed by Energinet, cf. section 23 (3) of the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Such costs will be borne by the Danish State. The location site of the Offshore Wind Farm is further stated below under section "Place of Performance" as well as in the procurement material Appendix 2 (Location of the Concession Area). Reference is further made to the regulation in the Procurement Specifications, Annex F (Concession Agreement), Appendix 1 (Project Specification), and the procurement material as a whole.

Partecipare o no?

Sei domande prima di impegnare una squadra. Sotto ciascuna, ciò che il registro ne sa. Le risposte sono tue.

  1. A tuo favore:

    Soddisfiamo tutti i requisiti di partecipazione?

    Procedura aperta: qualsiasi fornitore interessato può presentare un'offerta.

    Sopra la soglia UE: aperta alle imprese di qualsiasi paese UE.

  2. Decidi tu:

    Possiamo eseguirlo con la squadra che abbiamo?

    Stimato in 883,1 Mln €.

  3. Decidi tu:

    Abbiamo due referenze comparabili?

    I lavori comparabili rientrano in Lavori di costruzione.

  4. A tuo favore:

    La scadenza basta per un'offerta seria?

    Mancano 752 giorni, di cui 536 lavorativi.

  5. Decidi tu:

    Resta margine al probabile prezzo di aggiudicazione?

    In questo paese questo tipo di contratto viene di solito aggiudicato tra 3,0 Mln € e 16,1 Mln €.

  6. Decidi tu:

    Conosciamo questa stazione appaltante?

    Il committente ha 6 avvisi nel registro e non ancora uno schema di vincitori.

Posso partecipare?

  • Procedura aperta: qualsiasi fornitore interessato può presentare un'offerta. Sopra la soglia UE: aperta alle imprese di qualsiasi paese UE.
  • Il bando è redatto in inglese.
  • Certificati di un altro paese UE? Verifica le equivalenze su eCertis

Fonte ufficiale

Fonte: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica sempre i dettagli nell'avviso ufficiale.

Segnala un errore in questo bando

Ultima verifica su TED - Tenders Electronic Daily (Publications Office of the EU) 14 ore fa

Quanto paga questo mercato

Il committente ha troppo poche aggiudicazioni proprie in questo settore: questo è l'intervallo delle ultime 331 aggiudicazioni per Lavori di costruzione (Danimarca).

Questo avviso
883,1 Mln €
Importo mediano
7,5 Mln €
Metà centrale delle aggiudicazioni passate
da 3,0 Mln € a 16,1 Mln €

La stima è superiore a tre aggiudicazioni passate su quattro.

Importi di aggiudicazione come pubblicati dalle fonti ufficiali. Da usare come riferimento, non come regola: oggetto, lotti e durata variano tra i contratti.

Danish Energy Agency

Danimarca

avvisi nel registro
6
aggiudicazioni
3

Questo committente non ha ancora aggiudicazioni registrate in questo settore. Aggiudicatari abituali, Lavori di costruzione - Danimarca

Impresa Aggiudicazioni Importo totale aggiudicato Ultima aggiudicazione
Per Aarsleff A/S 13 635,2 Mln € set 2026
Arkil A/S 10 66,2 Mln € lug 2026
Aarsleff Rail A/S 8 146,1 Mln € mar 2026
MT Højgaard Danmark A/S 6 432,5 Mln € set 2026
M.J. Eriksson A/S 6 153,7 Mln € giu 2026

Sulla base di 348 aggiudicazioni con profilo aziendale collegato negli ultimi 2 anni.

Contesto di mercato

Più grande del 99% degli avvisi aperti in Lavori di costruzione in Europa.

aperti ora in Lavori di costruzione
28.946
avviso aperto mediano
809.268 €

Gare simili

Aperte ora

Già aggiudicate

Non perderti nessuna gara come questa

561 nuovi avvisi per Lavori di costruzione in Danimarca negli ultimi 7 giorni. Ricevi un'email quando escono nuovi avvisi. Gratis.

Crea il mio avviso

752 giorni rimasti

Apri il bando

Scorciatoie da tastiera

Scorri un elenco senza toccare il mouse. Le scorciatoie restano inattive mentre scrivi in un campo.

j
Risultato successivo
k
Risultato precedente
Invio
Apri il risultato
n
Pagina successiva
p
Pagina precedente
c
Confronta questo risultato
s
Aggiungi questo risultato alla shortlist
o
Apri il risultato in una nuova scheda
x
Metti da parte questo risultato
/
Cerca da qualsiasi pagina
Ctrl K
Cerca da qualsiasi pagina
?
Mostra queste scorciatoie
Esc
Chiudi

Indice

Chiudi
Accedi

Lingua