Saltar al contenido
Aperlena

Irlanda - Obras de ingenieria y construccion - MetroLink, Dublin - Acuerdo marco M120 Heavy Civils Enabling Works

Original Ireland - Engineering works and construction works - MetroLink, Dublin - M120 Heavy Civils Enabling Works Framework Agreement

Abierta Anuncio de licitación Sin fecha límite publicada
Vigilar esta licitación

Te escribimos si cambia el plazo o se publica una corrección. Gratis. Iniciar sesión

El Veredicto Aperlena

Carrera abierta

Ningún proveedor domina: 9 empresas distintas se han llevado los últimos 12 contratos comparables de este comprador en 5 años. Es una carrera realmente abierta.

306 días
Espera prevista hasta la adjudicación
a partir de 3 adjudicaciones anteriores

Basado en 12 adjudicaciones comparables de este comprador en este sector durante 5 años. Cada veredicto se registra antes del resultado y se contrasta con el anuncio de adjudicación. Cómo nos puntuamos.

Resumen

Resumen generado automáticamente

Transport Infrastructure Ireland (TII), como poder adjudicador, contrata un acuerdo marco multiparte denominado M120 Heavy Civils Enabling Works Framework para ejecutar obras de ingenieria civil del programa MetroLink en Dublin, Irlanda. El alcance incluye la instalacion de obra, la logistica, el desvio de servicios, la limpieza del terreno, estudios y sondeos, excavaciones masivas de tierra y roca, construccion de viaductos, puentes, muros de contencion, pantallas y pilotes, estructuras de hormigon armado, seguimiento de asentamientos, gestion de aguas y residuos, trabajos de fontaneria y electricidad, y servicios de diseno. La licitacion se rige por el Reglamento de la UE de 2016 sobre contratacion de empresas de servicios, con dos lotes y un maximo de tres adjudicatarios por lote. Cada licitador solo puede optar a un lote. No se indican valor estimado ni fecha limite.

Descripción

The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for excavation and pile removal works near to Tara Street station (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information. Lot 1 will consist of call off contracts for large elements of civils works, which may include station boxes, tunnel portals, single or multi span viaducts, and other contract packages. The first call off contract to be awarded under Lot 1 will be for the construction of the underground MetroLink station box at Dublin Airport (the “Dublin Airport station box”). Further call offs under Lot 1 are anticipated potentially for additional station box/es, tunnel portal/s, single or multi span viaducts, or other related contract packages yet to be identified. The scope of this first call off contract under Lot 1 for the Dublin Airport station box is expected to comprise the following: • Detailed reinforcement design, design of all temporary works, design the construction methodology, to deliver the works (TII will provide the detailed design of the station box) • perform the roles of PSDP and PSCS • Consultation with daa, TII and other key stakeholders for the contractors design, traffic management, site logistics, construction equipment restrictions etc. • Surveys and/or additional ground investigations as maybe required • Erection and maintenance of site/access hoarding • Removal of any existing barriers, bollards, kerbs and street furniture • Removal or diversion of any utilities • Excavation works • Demolition and removal of materials from any structures on site • Construction of triage centre for PFAS • Analysis, treatment and disposal of PFAS contaminated soil • All construction works required for the construction of the airport station box • Any other works as may be required for interfacing with the M100, M400 and M500 Contracts • Procurement of ancillary equipment as may be necessary • Provison of as-built digital models/drawings and asset records • Preparation of site for take-over by other MetroLink contractors • Any other related works Refer to the PQQ documents for further information.; Lot 2 will consist of call off contracts for elements of civils works, which may include retaining walls, other foundation/support works, as well as other contract packages. The first call off contract to be awarded under Lot 2 is expected to be for excavation and removal of piling works near to Tara Street station. Further call offs under Lot 2 are anticipated potentially for retaining walls, construction of walkways/bridges, or other related contract packages yet to be identified. The scope of the first call off contract under Lot 2 is expected to comprise the following: Tara Street works: • Excavate and remove existing piles and infill excavation; Construction of support piles and temporary works • Ground excavation and backfill works, including reinstatement of surface finishes • Civil and structural design of retaining structures, temporary works, and works to remove existing piles • Demolition and/or removal of any piling columns or foundation materials as may be required • Perform the roles of PSDP and PSCS • Traffic & pedestrian management • Temporary drainage and surface water management• Any other works as may be required for interfacing with M100, M400 and M500 contracts • Obtain consents from key stakeholders for all activities required for the delivery of works • Ground monitoring surveys and soil / rock / water table analysis • Installation of instrumentation and monitoring to existing structures • Consultation with Dublin City Council, TII, and other key stakeholders • Erect construction hoarding / fencing to close off the site from public access • Removal or diversion of any utilities • Provision of as built digital models/drawings and asset records. Refer to the PQQ documents for further information.

Fuente oficial

Fuente: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica siempre los detalles en el anuncio oficial.

Última verificación con TED - Tenders Electronic Daily (Publications Office of the EU) hace 1 mes

Más de este comprador

Perfil completo del comprador

17 licitaciones abiertas ahora mismo

Quién suele ganar los contratos de este comprador en este sector

Empresa Adjudicaciones Importe total adjudicado Última adjudicación
Colas JV 2 €11,3M ago. 2024
Jons Civil Engineering Company Limited 2 €7,9M jul. 2025
McKeon Contech Ltd. t/a McKeon Group and Hereworks 2 €2,4M jul. 2024
Northern Road Markings Ltd 1 €2,0M oct. 2024
Road Safety Contracts Ltd 1 €1,4M oct. 2024

A partir de 12 adjudicaciones con perfil de empresa vinculado en los últimos 5 años.

Lo que este comprador ha pagado antes

A partir de 9 contratos comparables adjudicados por este comprador en este sector en los ultimos 4 anos.

€1,3M
Cuartil inferior
€2,0M
Importe mediano
€4,4M
Cuartil superior

Esta licitacion se estima un 60601.7% por encima de esa mediana

Adjudicaciones mas recientes

Importes de adjudicacion segun los publican las fuentes oficiales. Uselos como guia, no como regla: el alcance, los lotes y la duracion varian entre contratos.

Historial de cambios

Cada vez que una fuente oficial ha vuelto a publicar este anuncio con contenido distinto. Vigilamos todas las fuentes que indexamos, incluidas las copias regionales del mismo anuncio.

  1. Léelo antes de presentarte
    • Valor estimado: Fijado en 1.200.000.000 €
    • Objeto y criterios: Se ha ampliado la descripción. Reléela antes de presentarte.
    • Valor estimado: Fijado en 1.200.000.000 €

Sigue esta licitación y te escribimos en cuanto cambie. Crear cuenta

Licitaciones similares

Contexto de mercado

Licitación abierta media · Trabajos de construcción
32.824.770 €
31.035 abiertas ahora en Europa
Historial del comprador en Aperlena
176 anuncios registrados · 126 adjudicados
887.430.541 € en contratos adjudicados

No te pierdas ninguna licitación como esta

36 anuncios nuevos de Trabajos de construcción en Irlanda en los últimos 7 días. Recibe un email cuando aparezcan anuncios nuevos. Gratis.

Crear mi alerta

Atajos de teclado

Recorre una lista sin tocar el ratón. Los atajos no actúan mientras escribes en un campo.

j
Resultado siguiente
k
Resultado anterior
Intro
Abrir el resultado
n
Página siguiente
p
Página anterior
c
Comparar este resultado
s
Añadir este resultado a la lista corta
/
Ir al cuadro de búsqueda
?
Mostrar estos atajos
Esc
Cerrar