Saltar al contenido
Aperlena

Finlandia - Sistema de gestión de almacén - Sistema de automatización de farmacia (almacén, inventario y logística interna)

Original Finland - Warehouse management system - Pharmacy Automation System (Warehouse, Inventory and Internal Logistics)

Adjudicada Adjudicación de contrato Sin fecha límite publicada
Vigilar esta licitación

El plazo de ofertas ha cerrado. Una adjudicación o una corrección de este anuncio: un email cuando el registro lo ve. Iniciar sesión

  1. Adjudicada
  2. Publicada

Resumen

Resumen generado automáticamente

El grupo HUS adquirió un sistema de automatización para su almacén de farmacia, que incluye automatización de almacenamiento, sistemas de transporte con elevación de palés y cajas, y sistemas de control, para automatizar la gestión, el almacenamiento y la recogida de suministros farmacéuticos en sus instalaciones de Helsinki. El contrato se adjudicó a Algol Technics Oy por 4.073.550 EUR. El precio adjudicado es un 19% inferior al valor estimado de 5.000.000 EUR. La adjudicación tuvo lugar el 27.05.2026. El comprador es HUS-yhtymá y el contrato está adjudicado.

Descripción

HUS Group (hereinafter referred also as "HUS" or "Contracting Authority") requested Candidates to submit a Request to Participate for a procurement of Pharmacy Warehouse Automation System and related services therein. The system was to include automation of HUS Pharmacy Warehouse, Inventory and Internal Logistics. The object of the procurement was a comprehensive inventory automation solution. The system as well as all the related services specified as the object of this procurement were hereinafter referred to as "System". OBJECT The purpose of the System was to automate the management, storage, and pickup of pharmaceutical supplies. The storage and collection of medicines was to be carried out by a control system that received orders from the pharmacy's ERP system, directed the picking and delivery of orders, monitored product inventory levels, and reported them to the ERP system. The System had to function seamlessly as part of the pharmaceutical supply and its operational processes, including, for example: -Storage automation systems -Conveyor systems including pallet lift and box lifting systems -Control systems The System to be procured was to be installed at the Contracting Authority's facilities in Helsinki. AIM OF THE PROCUREMENT The aim of the procurement was to maximize the automation of storage and collection of packages, minimize picking errors, sort collections according to delivery routes to dispatch areas, and enable the automatic transfer of incoming goods as pallets from the terminal area of the service yard to the pharmaceutical warehouse. The pharmacy received deliveries of medicines from wholesalers in the form of several dozen pallets every weekday. Additionally, the aim was to transfer manufactured medicines from the cleanroom of pharmaceutical production to the pharmaceutical warehouse for storage at different temperatures. In this context, the warehouse automation referred to an automatic device used for the storage and distribution of medicines, capable of storing a large number of packages within the device relative to the floor space required by the device, and collecting product packages based on given requests. The Contracting Authority sought a solution where picking was swift and malfunction of a single device did not cause significant disruptions to the unit's operations. The system as a whole had to take into account logistical needs. INSTALLATION The Supplier is responsible for installing the System in the premises in cooperation with the contractor of the new building. When positioning the devices, the Supplier has to take into account the passageways in the warehouse and the structural columns of the building. Collaboration with the contractor during the construction phase is required, including planning the placement of the System and discussing inlets and other facilitative details with the contractor. SCHEDULE The Contract was signed in the first half of 2026. After the supplier selection, the Supplier, Contracting Authority and End User, and Constructor will prepare a project schedule that considers the installation schedules of the different parts of the procurement. The start of the installation work for the warehouse automation is to be agreed upon with the builder. Commissioning tests and qualifications will be carried out with the user after the building is handed over.

Fuente oficial

Fuente: TED - Tenders Electronic Daily (Publications Office of the EU)

Verifica siempre los detalles en el anuncio oficial.

Última verificación con TED - Tenders Electronic Daily (Publications Office of the EU) hace 6 horas

Más de este comprador

Perfil completo del comprador

25 licitaciones abiertas ahora mismo

Adjudicaciones recientes

Licitaciones similares

7

días restantes

Cobottihitsausasema

Finlandia Maquinaria industrial Rovaniemen koulutuskuntayhtymä

75.000 €

valor est.

Contexto de mercado

Licitación abierta media · Maquinaria industrial
1.848.579 €
2.408 abiertas ahora en Europa 170% por encima de la media del sector
Historial del comprador en Aperlena
257 anuncios registrados · 105 adjudicados
125.192.423 € en contratos adjudicados

No te pierdas ninguna licitación como esta

9 anuncios nuevos de Maquinaria industrial en Finlandia en los últimos 7 días. Recibe un email cuando aparezcan anuncios nuevos. Gratis.

Crear mi alerta

Atajos de teclado

Recorre una lista sin tocar el ratón. Los atajos no actúan mientras escribes en un campo.

j
Resultado siguiente
k
Resultado anterior
Intro
Abrir el resultado
n
Página siguiente
p
Página anterior
c
Comparar este resultado
s
Añadir este resultado a la lista corta
/
Ir al cuadro de búsqueda
?
Mostrar estos atajos
Esc
Cerrar